Questions # 11:

Implementing the green building measures claimed for EDGE certification is the responsibility of

Options:

A.

the Client.

B.

the Certifier.

C.

the EDGE Auditor.

D.

the EDGE Partner.

Questions # 12:

Utility cost savings are calculated based on reduction in total:

Options:

A.

Electricity and water consumption.

B.

Generator fuel and water consumption.

C.

Building energy and water consumption.

D.

Energy and water consumption from the supply grid.

Questions # 13:

A hotel developer is planning a project. The specifications are based on corporate design standards for water fittings, lighting, heating, and air-conditioning. The EDGE Base Case will:

Options:

A.

Not be suitable for certification of this project.

B.

Be adapted to accommodate corporate specifications.

C.

Use the local typical building practices or code.

D.

Be verified on a case-by-case basis for the hotel chain.

Questions # 14:

Which are the certification levels within the EDGE certification system?

Options:

A.

EDGE Certified, EDGE Silver, and EDGE Gold

B.

EDGE Silver, EDGE Gold, and EDGE Platinum

C.

EDGE Certified, EDGE Advanced, and EDGE Zero Carbon

D.

EDGE Certified, EDGE Advanced, and EDGE Zero Energy

Questions # 15:

In EDGE software, which of the following is a water saving measure?

Options:

A.

Drip irrigation

B.

Hose pipe irrigation

C.

Sprinkler irrigation

D.

Water efficient landscaping

Questions # 16:

For a project in a hot and dry climate with no air-conditioning system, which of the following will NOT have an impact on the occupants' thermal comfort?

Options:

A.

Ceiling fans

B.

Solar shading

C.

Wall and roof insulation

D.

Solar photovoltaics

Questions # 17:

In order for a project to complete the design certification stage requirements, the EDGE Client must do which of the following?

Options:

A.

Internally review the EDGE measures with their design team and third-party consultant.

B.

Access the EDGE software and begin and complete a full self-assessment of the building.

C.

Provide the EDGE Auditor access to the self-assessment and all supporting documentation.

D.

Review and sign an agreement with a local or global partner to provide EDGE certification services.

Questions # 18:

Which of the following types of light bulbs will have the highest efficacy of lumens per watt?

Options:

A.

T5 fluorescent lamps

B.

T8 fluorescent lamps

C.

Light emitting diodes LEDs

D.

Compact fluorescent lamps CFLs

Questions # 19:

How often is the EDGE Baseline reviewed, including the geographic coverage of EDGE?

Options:

A.

1–2 years

B.

3–5 years

C.

6–8 years

D.

8–10 years

Questions # 20:

How often should the EDGE Advanced certification be renewed?

Options:

A.

Renewal is done every two years.

B.

Renewal is not required.

C.

First renewal is done after two years and subsequently every four years.

D.

First renewal is done after four years and subsequently every two years.