Spring Sale Limited Time 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = simple75

Pass the EMC Storage Administrator D-VXR-DY-23 Questions and answers with Dumpstech

Exam D-VXR-DY-23 Premium Access

View all detail and faqs for the D-VXR-DY-23 exam

Practice at least 50% of the questions to maximize your chances of passing.
Viewing page 2 out of 3 pages
Viewing questions 11-20 out of questions
Questions # 11:

During the activation of Internal SRS, the implementation engineer receives a message that the deployment has failed What is a possible cause?

Options:

A.

SRS VE Gateway on the same subnet as the VxRail Manager

B.

VxRail status already set to installed' in IB database

C.

Site ID mismatch between the IB database and the SRS Wizard

D.

Witness Gateway not configured following Dell best practices

Questions # 12:

An implementation engineer is deploying a new VxRail cluster What should they confirm before installing the hardware?

Options:

A.

At least 24 in (61 cm) of clearance exists in front of and behind the cabinet

B.

Redundant power zones exist with adequate power cables

C.

Power distribution supports only the power rating of a single node

D.

Service laptop is on the same IP network as the iDRACs

Questions # 13:

A customer has decided that they will be using the Spanning Tree protocol in their Dell EMC ToR switches How should the switch ports used for VxRail be configured to achieve a successful deployment?

Options:

A.

Set the port type to edge

B.

Enable link aggregation for all ports

C.

Set the port mode to access

D.

Enable MLD snooping and querier

Questions # 14:

What is the correct sequence of steps to perform a RASR Factory Reset using an SD card?

Question # 14

Options:

Questions # 15:

From what environment must a network administrator run VxRail network validation?

Options:

A.

Windows PowerShell command prompt

B.

Same subnet as VxRail Management Network

C.

Top of Rack switches

D.

VxRail Deployment Wizard

Questions # 16:

For which typical activity would the Full data migration setting be used when placing a VxRail host into maintenance mode?

Options:

A.

Temporary maintenance

B.

Rebooting a single ESXi host

C.

Shutting down an entire cluster

D.

Permanently removing host from cluster

Questions # 17:

What is a supported witness configuration for a 3+3+1 VxRail Stretched Cluster?

Options:

A.

vSAN Witness appliance with customer provided license

B.

Physical ESXi host with included cluster license

C.

Physical ESXi host with multiple VxRail clusters as witness

D.

vSAN Witness appliance or a physical ESXi host

Questions # 18:

What is validated by running the Proactive VM Creation test in vCenter on a VxRail cluster?

Options:

A.

vSAN operates successfully

B.

Network firewalls are configured correctly

C.

vSAN has sufficient storage capacity

D.

Network performance is sufficient

Questions # 19:

An implementation engineer is expanding an existing VxRail E Series cluster with an additional node The version of the node is not at the current cluster level and is not compatible

What action must be performed before adding the node?

Options:

A.

Order node with correct image

B.

RASR Factory Reset

C.

RASR Factory Image Upgrade

D.

Compute node expansion

Questions # 20:

What is a valid 2-node VxRail cluster configuration?

Options:

A.

Series with 4x 25 GbE in a direct-connect configuration

B.

Series with 4x 10 GbE in a switch configuration

C.

Series with 4x 1 GbE in a direct-connect configuration

D.

Series with 2x 25 GbE in a switch configuration

Viewing page 2 out of 3 pages
Viewing questions 11-20 out of questions