Spring Sale Limited Time 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = simple75

Pass the HP Aruba Certified Professional - Campus Access HPE7-A03 Questions and answers with Dumpstech

Exam HPE7-A03 Premium Access

View all detail and faqs for the HPE7-A03 exam

Practice at least 50% of the questions to maximize your chances of passing.
Viewing page 3 out of 3 pages
Viewing questions 21-30 out of questions
Questions # 21:

Which security requirements are supported for accessing device management by your customers? (Select three.)

Options:

A.

RadSec

B.

RADIUS

C.

TACACS

D.

GRE

E.

LDAPS

Questions # 22:

The current IT staff is used to working with legacy Aruba OS-S (ProCurve> equipment. They are worried that they cannot handle Aruba OS-CX switches due to the different command syntax. What are two ways to make the transition easier for them? (Select two.)

Options:

A.

create aliases

B.

CL1 Reference Guide for Arouba OS-CX. Aruba OS-Switch, Comware and Cisco IOS

C.

Aruba CU Bank

D.

ASP

Questions # 23:

Which is true when it comes to Aruba Central licensing for gateways? (Select two.)

Options:

A.

Aruba Gateway normal licensing is subdivided into three categories: Foundation, Advanced, and Foundation Base.

B.

SD-WAN Gateway functionality requires security licensing.

C.

Aruba SD-Branch Gateway licenses allow normal WLAN Gateway features within a campus.

D.

Aruba WLAN Gateway licenses allow normal SD-Branch features within a campus.

Questions # 24:

You hired a junior engineer to assist you with a large-scale network infrastructure project. The engineer has never worked on such a complex project 'ants to better understand the role that each role that each stakeholder will play in the project.

March the stakeholder title to the responsibilities that would most likely apply to their role.

Question # 24

Options:

Questions # 25:

A global cruise line company needs to refresh its current fleet. They win refresh the insides' of the ship to be cost-effective and increase their sustain ability. They Mill replace the complete WLAN/LAN hardware of the ship. In this refresh, the company will not refresh Us current security requirements. The CIO also wants to limit the number of unused ports in the switches. Future expansion will always mean a refresh of hardware. They start with the smallest ship with a maximum of 800 guests

Each ship has a LAN infrastructure consisting of two core switches, up to 10 redundant distribution switches, and up to 500 access switches (400 cabins. 100 technical rooms). The Core switches are located in the MDF of the ship and the distribution switches are located in the IDFs of the ship. Each cabin and technical room gets one single access switch.

The cabling structure of the ship will not be refreshed. Each IDF is connected to the MDF by SMF. of which two pairs are available for the interconnect between the core and distribution. The length of SM fiber between MDF and IDF is less than 300 meters (930 ft) and the type used is 0S1. Each cabin is connected by a single 0M2 pair to the IDF. the maximum length is 60 meters (200 ft). Each technical room is connected by a single 0M2 pail to the IDF. with lengths between 100 and 150 meters (320 and 500 ft).

For each cabin/technical room the customer is looking to replace their current fan-less 2530/2540 without changing the requirements, except they need to upgrade the uplink to distribution switch to 10GbEto handle the increased network traffic, and the technical rooms need redundant power.

The WLAN infrastructure will be 1:1 refreshed without new cabling or new AP locations. Their WLAN Infrastructure is based on the 200/300 series Indoor and outdoor APs running instantOS (less than 300 APs). the customer has no change in WLAN requirements.

The cruise line company will replace its current Internet connection before the LAN/WLAN refresh. The new Internet connection will provide a 99.8% uptime, which is needed to ensure the paid guest Wi-Fi is always operational. With this new internet connection, the CIO of the cruise line wants to base the design on the ESP architecture from Aruba because Internet connection is guaranteed.

The week after the presentation of your design to the CIO of the cruise line company, the CIO calls you to discuss increasing the security of the wired network Infrastructure. Since one of their competitors had one of their cruise ships cyber hacked, the CSO of the cruise line has mandated increased security on the wired network. They have heard about dynamic segmentation and central and decentral overlay networks.

What would you advise as the most cost-efficient solution?

Options:

A.

Standardize on Aruba 6000 switches for the access layer, add a cluster of 9240 GWs. and Implement central overlay networks on UBT basis.

B.

Standardize on Aruba 6100 switches for the access layer, add a cluster of 9240 GWs. and Implement central overlay networks on UBT basis.

C.

Standardize on Aruba 6300 switches for the access layer, add a cluster of 9240 GWs. and Implement central overlay networks on UBT basis.

D.

Standardize on Aruba 6200 switches for the access layer, add a cluster of 9240 GWs. and Implement central overlay networks on UBT basis.

Questions # 26:

A large multinational financial institution has contracted you to design a new full-stack wired and wireless network for their new 6-story regional office building. The bottom two floors of this facility will be retail space for a large banking branch. The upper floors will be carpeted office space for corporate users, each floor being approximately 100.000 sq ft (9290 sqm). Data centers are all off site and will be out of scope for this project. The customer is underserved by its existing L2-based network infrastructure and would like to take advantage of modern best practices in the new design. The network should be fully resilient and fault-tolerant, with dynamic segmentation at the edge.

The retail space will include public guest Wi-Fi access. Retail associates will have corporate tablets for customer service, and there will be a mix of wired and wireless devices throughout the retail floors. The corporate users will primarily use wireless for connectivity, but several wired clients, printers, and hard VoIP phones will be in use.

The customer is also planning on renovating the corporate office space in order to take advantage of "smart office' technology. These improvements will drive blue-dot wayfinding. presence analytics, and other location-based services

The client decides that they would like for all of their exposed printer, conference room, and VoIP phone

connections to be controlled by a stateful firewall

What could be planned to ensure that these ports will meet the customer's requirements?

Options:

A.

Tunneled Node

B.

Multi-Zone

C.

Airgroup

D.

Web Portal

Questions # 27:

A global cruise line company needs to refresh its current fleet. They win refresh the insides' of the ship to be cost-effective and increase their sustain ability. They Mill replace the complete WLAN/LAN hardware of the ship. In this refresh, the company will not refresh Us current security requirements. The CIO also wants to limit the number of unused ports in the switches. Future expansion will always mean a refresh of hardware. They start with the smallest ship with a maximum of 800 guests

Each ship has a LAN infrastructure consisting of two core switches, up to 10 redundant distribution switches, and up to 500 access switches (400 cabins. 100 technical rooms). The Core switches are located in the MDF of the ship and the distribution switches are located in the IDFs of the ship. Each cabin and technical room gets one single access switch.

The cabling structure of the ship will not be refreshed. Each IDF is connected to the MDF by SMF. of which two pairs are available for the interconnect between the core and distribution. The length of SM fiber between MDF and IDF is less than 300 meters (930 ft) and the type used is 0S1. Each cabin is connected by a single 0M2 pair to the IDF. the maximum length is 60 meters (200 ft). Each technical room is connected by a single 0M2 pail to the IDF. with lengths between 100 and 150 meters (320 and 500 ft).

For each cabin/technical room the customer is looking to replace their current fan-less 2530/2540 without changing the requirements, except they need to upgrade the uplink to distribution switch to 10GbEto handle the increased network traffic, and the technical rooms need redundant power.

The WLAN infrastructure will be 1:1 refreshed without new cabling or new AP locations. Their WLAN Infrastructure is based on the 200/300 series Indoor and outdoor APs running instantOS (less than 300 APs). the customer has no change in WLAN requirements.

The cruise line company will replace its current Internet connection before the LAN/WLAN refresh. The new Internet connection will provide a 99.8% uptime, which is needed to ensure the paid guest Wi-Fi is always operational. With this new internet connection, the CIO of the cruise line wants to base the design on the ESP architecture from Aruba because Internet connection is guaranteed.

The week after the presentation of your design to the CIO of the cruise line company, the CIO calls you to discuss increasing trie security of the wired network Infrastructure. Since one of their competitors had one of their cruise ships cyber hacked, the CSO of the cruise line has mandated increased security on the wired network. They nave heard about dynamic segmentation and central and decentral overlay networks.

What would you advise as the most cost-efficient solution?

Options:

A.

Standardize on Aruba 6000 switches for the access layer, add a cluster of 9240 GWs. and Implement central overlay networks on UBT basis.

B.

Standardize on Aruba 6100 switches for the access layer, add a cluster of 9240 GWs. and Implement central overlay networks on UBT basis.

C.

Standardize on Aruba 6300 switches for the access layer, add a cluster of 9240 GWs. and Implement central overlay networks on UBT basis.

D.

Standardize on Aruba 6200 switches for the access layer, add a cluster of 9240 GWs. and Implement central overlay networks on UBT basis.

Questions # 28:

A customer wants to have the ability to show network usage. Which product would allow them to have this visibility?

Options:

A.

Central

B.

ClearPass

C.

UXI

D.

Aruba OS 8.X

Viewing page 3 out of 3 pages
Viewing questions 21-30 out of questions