Spring Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = simple70

Pass the iSQI Other Certification CTAL-TAE Questions and answers with Dumpstech

Exam CTAL-TAE Premium Access

View all detail and faqs for the CTAL-TAE exam

Practice at least 50% of the questions to maximize your chances of passing.
Viewing page 3 out of 3 pages
Viewing questions 21-30 out of questions
Questions # 21:

You are reviewing the testability of your SUT.

Which of the following BEST refers to the characteristic of OBSERVABILITY?

Options:

A.

The ability of the SUT to perform its intended function for a specified period of time

B.

The ability to exercise the SUT by entering inputs, triggering events and invoking methods

C.

The ability of the SUT to prevent unauthorized access to its components or data.

D.

The ability to identify states, outputs, intermediate result and error messages in the SUT

Questions # 22:

You have been tasked with adding the execution of build verification tests to the current CI/CD pipeline used in an Agile project. The goal of these tests is to verify the stability of daily builds and ensure that the most recent changes have not altered core functionality. Currently, the first activity performed as part of this pipeline is the static source code analysis. Which of the following stages in the pipeline would you add the execution of these smoke tests to?

Options:

A.

As a first activity, before performing static source code analysis and before generating the new build

B.

After performing static analysis on the source code and before generating the new build

C.

After deploying the new build to the test environment and before performing more extensive testing

D.

As a final activity, immediately before releasing the new build into production

Questions # 23:

A TAS is used to run on a test environment a suite of automated regression tests, written at the UI level, on different releases of a web app: all executions complete successfully, always providing correct results (i.e., producing neither false positives nor false negatives). The tests, all independent of each other, consist of executable test scripts based on the flow model pattern which has been implemented in a three-layer TAF (test scripts, business logic, core libraries) by expanding the page object model via the façade pattern. Currently the suite takes too long to run, and the test scripts are considered too long in terms of LOC (Lines of Code). Which of the following recommendations would you provide for improving the TAS (assuming it is possible to perform all of them)?

Options:

A.

Modify the TAF so that test scripts are based on the page object model, rather than the flow model pattern

B.

Implement a mechanism to automatically reboot the entire web app in the event of a crash

C.

Split the suite into sub-suites and run each of them concurrently on different test environments

D.

Modify the architecture of the SUT to improve its testability and, if necessary, the TAA accordingly

Questions # 24:

What is NOT a factor in considering when you are asked to ensure an effective transition from manual to automated tests?

Options:

A.

Complexity to automate the manual test cases

B.

Correctness of test data and test cases

C.

The look and feel of the SUT

D.

The controllability of the SUT

Viewing page 3 out of 3 pages
Viewing questions 21-30 out of questions