Black Friday VIP Hour Limited Time 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = simple75
Pass the iSQI ISQI certification CTAL-TAE_V2 Questions and answers with Dumpstech
Exam CTAL-TAE_V2 Premium Access
View all detail and faqs for the CTAL-TAE_V2 exam
Which items should be included in a report that is produced after execution of a test suite?
Which of the following practices can be used to specify the active (i.e., actually available) features for each release of the SUT and determine the corresponding automated tests that must be executed for a given release?
You are employed as a TAE on a project to build a purchasing system. The main requirements for the system are:
1) Allow users to enter details of items that they wish to have purchased and, from these details, create a purchase request.
2) Take each purchase request through a workflow that will allow the requestor’s line manager to approve the request, reject it, or return it for clarification/modification.
3) Forward approved requests to the Purchasing Department.
4) Allow purchasers to find the best available supplier and place the request on that supplier as a purchase order.
Requirement 1 has now been delivered and has been satisfactorily tested manually. In parallel, you have developed a TAS so that functional suitability testing can be automated.
You have just conducted a pilot of the TAS on the implementation of Requirement 1 and several things went wrong:
• One test failed because some reference data that it needed was missing. This and several other failures were difficult to diagnose.
• Another test failed unexpectedly because an old version of the script was used.
Which three measures could mitigate these risks during deployment?
a) Full test logging down to and including trace level
b) Identification and correct configuration of all firewalls
c) Automated creation and loading of all data to meet test preconditions
d) Provision of proper device configuration plans
e) Careful packaging with thorough configuration management
(In User Acceptance Testing (UAT) for a new SUT, in addition to the manual tests performed by the end-users, automated tests are performed that focus on the execution of repetitive and routine test scenarios. In which of the following environments are all these tests typically performed?)
Which statement about layering in a test automation framework is TRUE?
Your TAF writes detailed test logs for every test that it executes. Data storage space in the test environment is limited, so after each run it is necessary to remove unnecessary detail from the log for tests that passed and move the data that must be kept to a different place.
What would be the BEST way to do this?
(Which of the following aspects of “design for testability” is MOST directly associated with the need to define precisely which interfaces are available in the SUT for test automation at different test levels?)
Which of the following should be done when checking the composition of the test suite?
You have been recruited as a TAE by a large travel agency and are now responsible for a mature TAS that is dedicated to functional testing of the company’s booking system, which covers flights, hotels, and packaged holidays. This application contains a complex UI and a lot of functionality. It is undergoing constant maintenance and enhancement by an Agile team that adds tests to the regression test suite at the end of every iteration.
The TAS supports structured scripting and this has been implemented to a high standard, with a well-managed script library and minimal code duplication. The TAA will not support any more advanced scripting techniques. The test automation that has been achieved so far was well received at first but is now the target of increasing criticism. It is perceived as being old-fashioned, poorly documented and, in particular:
1. The test script maintenance overhead is becoming excessive because the test analysts frequently want data values to be changed.
2. Test analysts are complaining that a new test which is similar to an existing one, except for data values, requires a new high-level script, and that they must ask a technical test analyst to do this for them.
3. The nightly full regression run is taking a long time and there is a risk that, as more tests are added, it will soon take too long to run in the available window.
4. Some tests break frequently because of slow response from the SUT.
5. Some transactions are difficult to verify because they rely on variables that cannot be seen through the UI of the SUT.
6. The UI of the TAF is difficult to learn.
The SUT architect is planning a major new release and they have offered to include features that will enhance its testability. You already have plans to deal with items 1, 2 and 3 on the list, so now you are considering how you might mitigate items 4, 5 and 6.
Which TWO improvements will BEST address items 4, 5 and 6?
a) Add an event mechanism to the SUT which the TAF can subscribe to
b) Adopt a set of standard setup and teardown methods
c) Add an API to the SUT that will make the internal variables observable
d) Update and improve the documentation of the TAA
e) Implement hard-coded waits in scripts that have been affected by slow SUT response
Your TAS is being used for automated functional suitability testing of a stock management system. Several tests have crashed. Despite the fact that the SUT creates detailed logs of all its activity, it has been difficult to determine the reason(s) for these crashes from the TAS and SUT test logs.
What actions are MOST likely to help with debugging?
a) Ensure that the TAS logs a count of how many times each test case is run.
b) Ensure that the SUT logs all available configuration data when it starts up.
c) Ensure that the SUT logs all available crash dumps and stack traces in the event of failure.
d) Ensure that the SUT logs all values of randomly generated test input data.
e) Ensure exact time synchronization of all test logs before any tests are run.