Spring Sale Limited Time 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = simple75

Pass the Microsoft Azure AZ-400 Questions and answers with Dumpstech

Exam AZ-400 Premium Access

View all detail and faqs for the AZ-400 exam

Practice at least 50% of the questions to maximize your chances of passing.
Viewing page 2 out of 8 pages
Viewing questions 11-20 out of questions
Questions # 11:

You need to meet the technical requirements for monitoring App1.

What should you use?

Options:

A.

Splunk

B.

Azure Application Insights

C.

Azure Advisor

D.

App Service logs

Questions # 12:

To resolve the current technical issue, what should you do to the Register-AzureRmAutomationDscNode command?

Options:

A.

Change the value of the ConfigurationMode parameter.

B.

Replace the Register-AzureRmAutomationDscNode cmdlet with

Register-AzureRmAutomationScheduledRunbook

C.

Add the AllowModuleOverwrite parameter.

D.

Add the DefaultProfile parameter.

Questions # 13:

HOTSPOT

You have an Azure virtual machine named VM1 that runs Linux.

You plan to deploy the Desired State Configuration (DSC) extension to VM1.

You need to grant the Log Analytics agent the appropriate directory permissions.

How should you complete the command? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Question # 13

Options:

Questions # 14:

Which branching strategy should you recommend for the investment planning applications suite?

Options:

A.

release isolation

B.

main only

C.

development isolation

D.

feature isolation

Questions # 15:

HOTSPOT

You are using PowerShell to administer Azure Log Analytics workspaces.

You need to list the available workspaces and their properties.

How should you complete the command? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Question # 15

Options:

Questions # 16:

You have Azure Pipelines and GitHub integrated as a source code repository.

The build pipeline has continuous integration enabled.

You plan to trigger an automated build whenever code changes are committed to the repository.

You need to ensure that the system will wait until a build completes before queuing another build.

What should you implement?

Options:

A.

path filters

B.

batch changes

C.

scheduled builds

D.

branch filters

Questions # 17:

How should you complete the code to initialize App Center in the mobile application? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection a worth one point.

Question # 17

Options:

Questions # 18:

What should you use to implement the code quality restriction on the release pipeline for the investment planning applications suite?

Options:

A.

a trigger

B.

a pre deployment approval

C.

a post-deployment approval

D.

a deployment gate

Questions # 19:

Which package feed access levels should be assigned to the Developers and Team Leaders groups for the investment planning applications suite? To answer, drag the appropriate access levels to the correct groups. Each access level may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

Question # 19

Options:

Questions # 20:

How should you configure the release retention policy for the investment planning applications suite? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Question # 20

Options:

Viewing page 2 out of 8 pages
Viewing questions 11-20 out of questions