Spring Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = simple70

Pass the Nokia Optical Network Professional 4A0-205 Questions and answers with Dumpstech

Exam 4A0-205 Premium Access

View all detail and faqs for the 4A0-205 exam

Practice at least 50% of the questions to maximize your chances of passing.
Viewing page 1 out of 2 pages
Viewing questions 1-10 out of questions
Questions # 1:

Which of the following sentences about FlexGrid is false?

Options:

A.

FlexGrid allows a more efficient channel spacing.

B.

Channels in FlexGrid systems are allocated with a granularity of 27.5GHz.

C.

FlexGrid systems use specific sets of boards. Old generation WDM systems need to be upgraded to support FlexGrid.

D.

The FlexGrid is currently standardized by ITU-T.

Questions # 2:

With reference to the power budget, what is the meaning of receiver dynamic range?

Options:

A.

It is the minimum power to be received for a given BER.

B.

It is the range between the receiver overload power and its sensitivity.

C.

It is the range between the maximum transmit power and the minimum transmit power.

D.

It is the maximum receiver power to prevent an overload.

Questions # 3:

Is it possible to modify node parameters within the edit EPT menu?

Options:

A.

Yes, the user can apply manual changes directly from this view

B.

Yes, but the user can modify only the node name and location

C.

No, this view is used to display a close-up view of the node

D.

Yes, the user can apply manual changes but only for non-GMPLS nodes, as the control plane reserves node resources not editable by the user

Questions # 4:

Is it possible to mix PSS-24x and PSS-8x shelves In an SWDM configuration?

Options:

A.

Yes, as both can be equipped within the same node

B.

No, as they are not compatible and cannot be used within the same node

C.

Yes, but the PSS-24X shelf must be configured as a master

D.

Yes, but the PSS-8X shelf must be configured as a master

Questions # 5:

Which of the following statements about Optical Add/Drop Multiplexers (OADMs) is FALSE?

Options:

A.

OADMs allow the user to terminate specific services through transponders.

B.

OADMs allow the user to pass-through specific services at the wavelength optical level (express channels).

C.

OADMs always require O-E-O conversion when passing-through optical channels.

D.

There are two main general classes of OADMs: FOADMs and ROADMs.

Questions # 6:

What is the meaning of demand in EPT?

Options:

A.

Demand refers to the amount of OTN interfaces within a single network element.

B.

Demand refers to the required capacity of a single network element in terms of bandwidth.

C.

Demand refers to the required number of trails to be automatically created to meet design requirements.

D.

Demand refers to one or more client signal.

Questions # 7:

A user needs to check for interface details against the commands is the correct one?

Options:

A.

show interface 11starla 1/17/L1 detail

B.

config card 11star1a interface 1/17 detail

C.

11starla 1/17 port-detail

D.

config interface detail 1/17/L1

Questions # 8:

Which of the following statements about the contentionless feature on a CDC-F node is TRUE?

Options:

A.

It represents the ability to support the Fixed Grid standard.

B.

It represents the ability to drop any lambda from any Add/Drop block port.

C.

It represents the ability to reroute lambdas to any direction.

D.

It represents the ability to drop the same wavelength from different degrees.

Questions # 9:

Is it possible to select the fiber type independently for each segment while designing a network in EPT?

Options:

A.

Yes, during the link creation through the wizard

B.

No, a unique type is allowed per design for all segments

C.

No, as the fiber type is selected for links only and it's one for whole design

D.

Yes, during the segment creation phase or editing

Questions # 10:

Which macro steps can be executed via CPB?

Options:

A.

Node creation, systems validation and system provisioning

B.

Power adjustment and generation of the system loss report

C.

Systems validation, system provisioning, power adjustment

D.

Node supervision, system validation and system provision

Viewing page 1 out of 2 pages
Viewing questions 1-10 out of questions