Big Cyber Monday Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = simple70
Pass the Nutanix NCM-MCI NCP-MCI-6.10 Questions and answers with Dumpstech
An administrator has received complaints about VM performance.
After reviewing the VM’s CPU Ready Time data shown in the exhibit, which step should the administrator take to diagnose the issue further?
Upon reaching the maximum instances of retained reports, what occurs?
An administrator wants toensure that user VMs on AHV hostscan take advantage ofbandwidth beyond a single adapter in a bond.
Which uplink Bond Type should the administrator configure to accomplish this?
An administrator migrated a physical MySQL database to a Nutanix cluster. After migration, peak load IOPS are lower than expected and latency is higher.
Which two steps should the administrator take to improve this behavior? (Choose two.)
An administrator is experiencingstorage performance issueson aWindows Server 2019 VMwith the following configuration:
vCPU: 1
VRAM: 8 GB
vSCSI: VirtIO SCSI Controller
vDisk: 2 (100 GB, 250 GB)
vNIC: VirtIO Fast Ethernet
TheAHV cluster is healthy, andother Windows VMs are performing well.
Which configuration change should be reviewed to enhance VM performance?
An administrator needs to configureNTPonPrism Central running on a Hyper-V cluster.
How should the administrator complete this task?
An administrator attempted toenable Data-in-Transit Encryptionon aScale-Out Prism Central clustertoencrypt service-level traffic between nodes. However, the featuredid not work correctly due to a firewall restriction.
Which CVM-specific port should be allowed through the firewall for Data-in-Transit Encryption?
An administrator needs to perform anLCM upgradeon anAHV host with GPUs.
What additional step is required before upgrading the host?
An administrator is working with a local network engineer to design the network architecture for a Disaster Recovery (DR) failover. Because DNS is well designed and implemented, DR will utilize a different subnet from production. To make planning and execution easy to implement, the network engineer would like to utilize the same last octet in DR.
What is the best way to achieve this?
An administratorwants to ensure that VMscan bemigrated and restarted on another nodein the event of asingle-host failure.
What action should be taken in Prism Element to meet this requirement?