Questions # 21:

An energy conservation project involving motion-activated light switches and electronic ballasts is expected to provide a savings of $400/month in utility costs, and reduce labor costs by $25/month. If the payback is estimated at 2.5 years, what is the estimated cost of the project?

Options:

A.

$10,200

B.

$11,250

C.

$12,000

D.

$12,750

Questions # 22:

Which project delivery method leaves contractor input out of the design phase?

Options:

A.

Integrated Delivery Project (IDP)

B.

Design Bid Build (DBB)

C.

Design Build (DB)

D.

Construction Management at Risk (CMAR)

Questions # 23:

Following standard accounting practices for the capital replacement of a generator, what would be the total capital budget?

Expense

Amount

New generator

$90,000

Removal of old generator

$9,000

Annual fuel

$2,000

Annual maintenance

$2,500

New batteries every three years

$1,500

Annual air permit

$700

New generator installation labor cost

$11,000

Options:

A.

$110,000

B.

$110,700

C.

$111,500

D.

$116,700

Questions # 24:

Boiler low water cut-offs are designed to stop the

Options:

A.

flow of steam.

B.

supply of air.

C.

operation of the burner.

D.

flow of make-up water.

Questions # 25:

NFPA 25 (2011) requires sprinkler system fire pumps to be tested in a flow condition at what frequency?

Options:

A.

weekly

B.

monthly

C.

quarterly

D.

annually

Questions # 26:

A facility manager wants to communicate to leadership the need to replace an old boiler. What is the most critical piece of information that is needed to support the capital budget request?

Options:

A.

the size of the existing boiler

B.

the annual cost to maintain the new boiler

C.

time frame for replacing the boiler

D.

the ROI for replacing the boiler

Questions # 27:

When storing oil or petroleum products over 1,320 gallons above ground or 42,000 gallons underground, a Spill Prevention, Control, and Countermeasure (SPCC) program is required in accordance with

Options:

A.

Federal Regulations 40 CFR Part 112 Oil Pollution Act.

B.

The Joint Commission Utility Management standards.

C.

OSHA Regulations 1926.153 Liquefied Petroleum Gas Act.

D.

NFPA 430 Storage of Liquid and Solid Oxidizers.

Questions # 28:

Which of the following Environment of Care (EOC) management plans requires inspecting buildings/facilities and grounds to identify hazardous conditions?

Options:

A.

Utilities Management

B.

Hazardous Materials Management

C.

Safety and Security Management

D.

Fire Safety Management

Questions # 29:

A diesel emergency generator is rated at 500 KVA. When the generator is tested, the load on it is 220 KVA. According to the NFPA, the MINIMUM testing requirements are to run the unit

Options:

A.

monthly under load for 30 minutes.

B.

annually with supplemental loads for 2 hours.

C.

monthly until the water temperature and oil pressure have stabilized.

D.

annually with supplemental loads for 30 minutes.

Questions # 30:

Where a required fire alarm system is out of service for more than 4 hours in a 24-hour period, which of the following is required according to NFPA Life Safety Codes?

Notify the authority having jurisdiction.

Provide an approved fire watch for all parties left unprotected by the shutdown.

Notify the building administrator.

Notify the fire alarm service company for repair.

Options:

A.

1 and 2 only

B.

1 and 3 only

C.

2 and 4 only

D.

3 and 4 only

Viewing page 3 out of 4 pages