Questions # 21:

In a Class I hazardous area, what is the maximum distance from an enclosure, containing arcing devices should a conduit seal be located?

Options:

A.

4 inches 10.16 cm away from the closest union or coupling

B.

10 inches 25.4 cm

C.

12 inches 30.48 cm

D.

18 inches 45.72 cm

Questions # 22:

Metallic shielding components such as tapes, wires, or braids shall be connected to a:

Options:

A.

equipment grounding busbar.

B.

low voltage ceramic insulator.

C.

low voltage connector.

D.

center tap of a transformer.

Questions # 23:

What requirement shall be included in a lockout/tagout procedure?

Options:

A.

An arc flash requirement where a high level of exposure is foreseen

B.

A power testing requirement where a direct exposure situation can be detected

C.

A voltage testing requirement where there might be direct exposure to electrical hazards

D.

A voltage and current testing for direct exposure situations

Questions # 24:

A source inspector reviewing a control panel should verify wiring against which project document as a core inspection activity?

Options:

A.

Employee training log

B.

One-line wiring diagram

C.

Freight invoice

D.

Packing list only

Questions # 25:

According to API 541, when specified, shipping preparations shall make the equipment suitable for outdoor storage from the time of shipment for at least:

Options:

A.

three months.

B.

six months.

C.

nine months.

D.

twelve months.

Questions # 26:

Which switchgear-related item is explicitly identified in the guide table of contents as an inspection topic?

Options:

A.

Cable tray color coding

B.

Metering

C.

Turbine nozzle alignment

D.

Firewater pump casing hardness

Questions # 27:

Who should the Source Inspector notify if they believe that product quality may be compromised by schedule pressures?

Options:

A.

Master Scheduler

B.

The inspection coordinator

C.

The shop QA Manager

D.

Project Manager

Questions # 28:

Why should the dates for source inspection scheduled work process events such as the pre-inspection meeting, key inspection events and anticipated shipping date be identified in advance?

Options:

A.

To allow coordination with other project members involved in the activity

B.

To ensure that all dates will meet the project schedule and quality requirements

C.

To provide a sound basis for inspection and test planning for each shop

D.

To be able to assign inspectors to the shops in order not to conflict with other projects

Questions # 29:

A circuit breaker is defined as:

Options:

A.

a one-shot device that causes the current carrying element to melt open, disconnecting the load from the source voltage.

B.

a type of device used to provide voltage protection.

C.

a means of energizing and de-energizing an electrical circuit.

D.

one or more enclosed vertical sections containing voltage.

Questions # 30:

According to NFPA 70, equipment shall be marked to show the hazardous environment for which it has been evaluated. Markings on this equipment shall include which of the following?

Options:

A.

Class, voltage, current, material of construction, equipment temperature

B.

Class, division, material classification group, equipment temperature, ambient temperature range

C.

Class, voltage, material classification group, operating temperature, ambient temperature range

D.

Class, division, material of construction, equipment temperature, ambient temperature range