Questions # 61:

An engineer must perform a predictive design for a wireless network for location readiness and to mitigate interference. Which power level does the engineer use?

Options:

A.

10 mw

B.

18 mw

C.

20 mw

D.

50 mw

Questions # 62:

A network engineer is managing a wireless network for a large corporate campus with the configuration.

•Two Cisco Catalyst 9800 Series Wireless Controllers: WLC1 and WLC2. both running Cisco IOS XE Software version 17.9.5. These controllers are configured in the same mobility group, named CorpMobility. to enable seamless roaming (or clients across the campus.

•The WLAN Guest is deployed on both controllers to provide internet access for visitors. Due to the company's strict security policies, all guest traffic must be anchored to WLC2 for centralized internet access and firewall enforcement. •Client data traffic from the Guest WLAN on WLC1 be tunneled to WLC2. ensuring consistent policy application regardless of where the client connects.

•The mobility tunnel between WLC1 and WLC2 is established over the campus backbone network, which occasionally experiences latency spikes due to high traffic loads. Which set of actions should the engineer take to validate the mobility tunneling for the control and data paths?

Options:

A.

On WLC2, run show wireless mobility summary to verify that WLC1 is listed as a mobility peer with control and data links Up Then, connect a client lo the Guest WLAN on WLC2 and run show wireless client mac-address detail on WLC2 to confirm that the client's mobility state is Anchored with WLC1 as the anchor controller.

B.

On WLC1, run show wireless mobility summary to verity that WLC2 is listed as a mobility peer with control and data links Up. Then, connect a client to the Guest WLAN on WLC1 and run show wireless client mac-address detail on WLC1 to confirm that the client's mobility stale is Anchored with WLC2 as the anchor controller.

C.

On WLC2, run show wireless mobility anchor to verify the anchoring configuration, and on WLC1. run show wireless client summary to check client associations. Then restart the two Cisco Catalyst 9800 Series Wireless Controllers and check that the mobility tunnel between WLC1 and WLC2 is established over the campus backbone network.

D.

On WLC1 and WLC2, run show wireless mobility summary to check that the mobility peer status, and then use ping to test connectivity between their management IPs. Then restart the two Cisco Catalyst 9800 Series Wireless Controllers and check that the mobility tunnel between WLC1 and WLC2 is established over the campus backbone network.

Questions # 63:

A school deploys a Cisco wireless infrastructure in its classrooms to support a high density of mobile devices. The network administrator wants to bond channels in groups of two and only allow APs to send 802.11 management frames at 24 MB. What should be included in the design to accomplish this objective?

Options:

A.

Set the channel width for 802.11b to 40 MHz and set data rates to 24 MB and Mandatory.

B.

Set the channel width for 802.11a to 40 MHz and set data rates to 24 MB and Supported.

C.

Set the channel width for 802.11a to 40 MHz and set data rates to 24 MB and Mandatory.

D.

Set the channel width for 802.11b to 40 MHz and set data rates to 24 MB and Supported.

Questions # 64:

An engineer is designing a wireless network for a small airport and completes the initial walkthrough phase of the facility Which step of the WLAN site survey should the engineer perform next?

Options:

A.

predeployment survey

B.

active survey

C.

post-deployment survey

D.

passive survey

Questions # 65:

A customer has determined that aesthetics is a primary concern for their upcoming guest deployment. Which design consideration can be leveraged to address this concern?

Options:

A.

Paint the access point to cover the LED from being noticeable.

B.

Use enclosures to hide the wireless infrastructure in the surrounding environment.

C.

Use AIR-AP-BRACKET-1 to allow for greater mounting locations

D.

Deploy environmentally friendly cabling components to blend into the environment.

Questions # 66:

Refer to the exhibit.

Question # 66

Client A is roaming from AP1 on WLC1 to AP2 on WLC2. The client roams between two APs registered to two different controllers. The WLAN on the two controllers is on a different subnet. Which scenario explains the client's roaming behavior?

Options:

A.

The client database entry is different than that of Layer 2 roam. (Instead of cop-ying, it moves the database to the new controller.)

B.

The client database entry is different than that of Layer 2 roam. (Instead of mov-ing, it copies the database to the new controller.)

C.

The client database entry is different than that of Layer 2 roam because the cli-ent database is neither moved nor copied into the new controller.

D.

The client database remains in the mobility anchor controller and it is not cop-ied or moved.

Questions # 67:

An engineer is conducting a Layer 2 site survey. Which type of client must the engineer match to the survey?

Options:

A.

best client available

B.

phone client

C.

normal client

D.

worst client available

Questions # 68:

Question # 68

Refer to the exhibit. During a post Mesh deployment survey, an engineer notices that frame collisions occur when MAP-1 and MAP-3 talk to RAP-2 Which type of issue does the engineer need to address in the design?

Options:

A.

co-channel interference

B.

backhaul latency

C.

hidden node

D.

exposed node

Questions # 69:

Clustering Cisco WLCs into a single RF group enables the RRM algorithms to scale beyond the capabilities of a single Cisco WLC. How many WLC and APs in an RF group can the controller software scale up to in WLC release 8.9 depending on the platform?

Options:

A.

up to 20 WLCs and 1000 APs

B.

up to 20 WLCs and 3000 APs

C.

up to 20 WLCs and 4000 APs

D.

up to 20 WLCs and 6000 APs

Questions # 70:

Refer to the exhibit.

Question # 70

A customer is deploying a Greenfield 802.11n network with data, voice, and location awareness using APs with the WSSI modules. Which two settings in the Cisco Prime Infrastructure Planning Tool, when selected, provide a more accurate prediction of the number of APs the customer must purchase for the new facility? (Choose two.)

Options:

A.

Override Coverage per AP

B.

Voice

C.

Data/Coverage

D.

Location with Monitor Mode APs

E.

Location