Spring Sale Limited Time 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = simple75

Pass the Cisco CCNP Enterprise 300-430 Questions and answers with Dumpstech

Exam 300-430 Premium Access

View all detail and faqs for the 300-430 exam

Practice at least 50% of the questions to maximize your chances of passing.
Viewing page 9 out of 9 pages
Viewing questions 81-90 out of questions
Questions # 81:

An engineer is planning an image upgrade of the WLC, and hundreds of APs are spread across remote sites with limited WAN bandwidth. The engineer must minimize the WAN utilization for this upgrade. Which approach must be used for the AP image upgrade?

Options:

A.

Predownload the new code to the APs.

B.

Use the Smart AP image upgrade feature.

C.

Allow the APs to download their code after WLC reboot.

D.

Execute parallel TFTP code upgrade on the APs via SSH.

Questions # 82:

What is configured to use more than one port on the OEAP to extend the wired network?

Options:

A.

remote LAN ACL

B.

AAA override

C.

client load balancing

D.

remote LAN

Questions # 83:

An engineer must provide a graphical report with summary grouped data of the total number of wireless clients on the network. Which Cisco Prime Infrastructure report provides the required data?

Options:

A.

Client Traffic Stream Metrics

B.

Client Summary

C.

Posture Status Count

D.

Mobility Client Summary

Viewing page 9 out of 9 pages
Viewing questions 81-90 out of questions