Questions # 61:

A networking team must implement a new management solution for the network devices at their organization. The solution must meet these requirements

• It must enable seamless monitoring, configuration, and troubleshooting while ensuring security and reliability.

• It must allow access to devices even if the production network is down.

• It must be easy to use and manage.

The company's budget is limited. Which implementation must the team perform to meet the requirements?

Options:

A.

in-band management solution that leverages the existing production network infrastructure for management traffic

B.

console-server solution to provide a dedicated management network

C.

out-of-band management solution to provide redundancy and flexibility

D.

remote-access VPN solution to provide secure access to the network devices

Questions # 62:

A network consultant reviews the requirements for the Storage Area Network (SAN) design. The proposed solution must offer a very efficient port usage and eliminate the need for a separate physical layer of switches and their associated ISLs. The design is not expected to require future expansion.

Which SAN topology must be used to meet these requirements?

Options:

A.

core-edge

B.

collapsed-core

C.

core-distribution-access

D.

edge-core-edge

Questions # 63:

A customer connects a high-speed Fibre Channel storage array to a Cisco MDS 9000 Series Switch using an 8 Gbps interface.

Which action guarantees line rate traffic processing on the interface?

Options:

A.

Set global buffering with B2B_credits for the interface.

B.

Set local buffering with B2B_credits for the interface.

C.

Configure the interface rate mode as dedicated.

D.

Configure the interface rate mode as shared.

Questions # 64:

An engineer is designing a data center that uses FCIP. How is QoS configured in this environment?

Options:

A.

A separate DSCP value and CoPP must be configured for all FCIP traffic and another for all of the FCIP in the data connection.

B.

A separate DSCP value must be configured for all FCIP VSAN traffic.

C.

A separate DSCP value and priority queuing must be configured for all FCIP traffic.

D.

Two separate DSCP values must be configured, one of all of the FCIP frames in the control TCP connection and another for all of the FCIP frames in the data connection.

Questions # 65:

Refer to the exhibit.

A high-availability setup for iSCSI is designed with the host running ISCSI software. Each storage port on the MDS exports the same two Fibre Channel target ports with different ISCSI target names. In this design, how many ISCSI session are created from the host so that recovery occurs if any component fails?

Options:

A.

2

B.

3

C.

4

D.

5

Questions # 66:

Question # 66

Refer to the exhibit. FCoE is used in the topology between the SAN Storage devices and SAN-Core routers. After noticing traffic drops to hosts accessing SAN-B storage, the engineering team wants to reduce the oversubscription ratio in the topology. Which action must the team take?

Options:

A.

Increase the bandwidth between SAN-A and SAN-B Storage toward the SAN-Core devices.

B.

Configure QoS to prioritize SAN-A traffic

C.

Configure QoS to prioritize SAN-B traffic.

D.

Increase the bandwidth between the SAN-Coro and SAN-Edgo devices.

Questions # 67:

Refer to the exhibit. A Cisco engineer is configuring a Cisco UCS integrated infrastructure for SAP HANA that consists of 8 x Cisco UCS B/C480-M5 servers for SAP HAN A and 4 x Cisco UCS C240-M5 C-Series rack mount servers for storage. The rack servers are equipped with Cisco VIC 1225T. The engineer plans to install RHEL8. but the boot process is interrupted at installation because the iSCSl LUNs are not recognized by the VIC adapter. After proper Investigation, the engineer concludes that the initiator and target configuration that is programmed on the primary ISCSl VNIC to the operating system Is missing. What is the reason for the issue?

Options:

A.

The network interfaces are not configured.

B.

The Linux ISO image is not Cisco approved.

C.

The boot parameter lp=ibft is not set.

D.

The storage system is not reachable

Questions # 68:

Drag and drop the technologies from the left onto the correct descriptions on the right.

Question # 68

Options:

Questions # 69:

An engineer must configure an interface for managing and orchestrating a Cisco Nexus device. The interface must be operational if the data and control planes crash, support IPv4 and IPv6 addressing, and have been access to its own VRF instance. Which interface should be used to meet these requirements?

Options:

A.

management interface

B.

lookup

C.

interface VLAN

D.

Physical interface

Questions # 70:

Question # 70

Refer to the exhibit. An engineer deployed a VXLAN fabric with this configuration:

• interface VLAN 100 on VTEP1 with no IP address

• interface VLAN 200 on VTEP4 with no IP address

Which set of actions must the engineer take to ensure that host A communicates with host B?

Options:

A.

Associate VN110000 to VRF Application on VTEP4.

Associate VNI 20000 lo VRF Web on VTEP1.

B.

Associate VN110000 to VRF Web on VTEP4.

Associate VNI 10000 to VRF Application on VTEP1.

C.

Associate VNI 20000 to VRF Application on VTEP1.

Associate VNI 20000 to VRF Web on VTEP1.

D.

Associate VNI 20000 to VRF Web on VTEP1.

Associate VNI 10000 to VRF Application on VTEP1.

Viewing page 7 out of 9 pages