Spring Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = simple70

Pass the HPE Storage Solutions HPE7-J01 Questions and answers with Dumpstech

Exam HPE7-J01 Premium Access

View all detail and faqs for the HPE7-J01 exam

Practice at least 50% of the questions to maximize your chances of passing.
Viewing page 2 out of 2 pages
Viewing questions 11-20 out of questions
Questions # 11:

An administrator wants to build a scale-out solution using two HPE Alletra 6000 storage arrays. Only the first array has been initialized. Use your cursor to place a + where the administrator can add the second uninitialized array to the first storage array.

Question # 11

Options:

Questions # 12:

A customer needs to replace their current data protection solution, including hardware and software. They have the following requirements:

    A single data management platform for data protection of hypervisor, container, cloud, physical, database, and application workloads

    Eliminate data silos across backups for files, objects, and archiving

    Needs to support a large, scale-out NAS solution

What is the best solution for this customer?

Options:

A.

HPE GreenLake Flex with Commvault and HPE Alletra 4000 storage servers

B.

HPE GreenLake Flex with HPE Zerto and HPE StoreOnce appliances

C.

HPE GreenLake Flex with Cohesity and HPE Alletra 4000 storage servers

D.

HPE GreenLake Flex with Veeam and HPE Alletra 4000 storage servers

Questions # 13:

A company has many applications running on bare metal, as well as on VMs.

Match the data protection software solution with its description. Each answer will be used once.

Question # 13

Options:

Questions # 14:

Which statement is correct concerning the hardware configuration of the HPE Alletra 5000 storage arrays?

Options:

A.

The SSD drives are installed in slots 22-24.

B.

The head shelf must have the maximum number of SSD drives installed.

C.

A maximum of six SSD drives are supported across the entire system.

D.

Dual Flash Carriers support both SAS and NVMe SSD drives.

Questions # 15:

An administrator needs to create an FCIP trunk connection between two data centers to interconnect their Brocade fibre data fabrics. Refer to the exhibit.

Question # 15

Based on this configuration, which statement is correct?

Options:

A.

This is an invalid configuration. FOP trunks must be configured with an even number of circuits.

B.

This is an invalid configuration. FCIP trunks must be configured using fibre channel ports.

C.

This is a valid configuration. The trunk will have one active connection and two standby connections.

D.

This is a valid configuration. The trunk will have two active connections and one standby connection.

Questions # 16:

A customer wants to implement HPE Cloud Bank Storage with the detach option LTU feature. Which statement is correct regarding the implementation of this feature?

Options:

A.

HPE Cloud Bank Store must be connected using the connect (read-write) option.

B.

A detached Cloud Bank datastore can only be reconnected to the HPE StoreOnce system from which it was detached.

C.

HPE Services is always required when reconnecting a detached datastore.

D.

Support for reading and writing to the detached datastore is supported with the detach license installed.

Questions # 17:

Refer to the exhibit.

Question # 17

A company is implementing a disaster recovery solution. The Asynchronous Remote Copy feature has been implemented between the HPE AUetra 9000 arrays at both sites. The customer Is interested in providing a disaster recovery (DR) solution that allows for business connectivity of their VMware VMs.

Which VMware solution should the company implement?

Options:

A.

vCenter Lifecycle Management Sarvice

B.

VMware Live Site Recovery/VMware Live Recovery

C.

VCF Operations: Continuous Performance

D.

vCenter Storage DRS

Questions # 18:

An HPE customer purchased an HPE B-Series SN7000B SAN fabric switch. QoS is currently not enabled. Which two statements are correct regarding buffer-to-buffer (BB) credits and the operation of the switch? (Choose two.)

Options:

A.

BB credits can be adjusted for specific applications or operating environments, but they must be agreed upon among all switches to allow the formation of the fabric.

B.

The default window size for fibre channel (FC) frame transmission is 1, but can be increased to 8 or 16, depending on the switch model.

C.

Each user port reserves eight buffer credits when online or offline.

D.

BB credits are based on link speed and frame size.

E.

By default, all BB credits are reserved.

Viewing page 2 out of 2 pages
Viewing questions 11-20 out of questions