Spring Sale Limited Time 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = simple75

Pass the ISTQB Foundation Level ISTQB-CTFL Questions and answers with Dumpstech

Exam ISTQB-CTFL Premium Access

View all detail and faqs for the ISTQB-CTFL exam

Practice at least 50% of the questions to maximize your chances of passing.
Viewing page 6 out of 13 pages
Viewing questions 51-60 out of questions
Questions # 51:

You are a tester working on a critical project. Based on the risk analysis you execution? Priority 1 is the highest and Priority 3 is the lowest priority.

Question # 51

Options:

A.

D-C- B-A

B.

D-B-A-C

C.

C-B-A-D

D.

D-A-B-C

Questions # 52:

A Static analysis tool analyzes a given program's CONTROL FLOW among other things. Which of the following options represents the most likely outcome of the control flow analysis:

Options:

A.

Identification of unreachable code

B.

Report on adherence to the coding standards

C.

Number of comment lines

D.

Number of source code lines

Questions # 53:

Which of the following BEST defines risk level?

Options:

A.

Risk level is determined by calculating the absolute value of the sum of all potential issues that may occur on the project

B.

Risk level is calculated by adding the probabilities of all planned risks to a project

C.

Risk level is calculated by dividing the sum of all known risks by the sum of all unknown risks

D.

Risk level is determined by the likelihood of an event happening and the impact or harm from that event

Questions # 54:

Which of the following statements regarding the test-first approach (principle of early testing) is true?

Options:

A.

An approach where the tests are written only as needed.

B.

An approach where the tests are written after implementation.

C.

An approach where the tests are written during implementation.

D.

An approach where the tests are written before implementation.

Questions # 55:

An application is subjected to a constant load for an extended period of time as part of a performance test While running this test, the response time of the application steadily slows down, which results in a requirement not being met This slowdown is caused by a memory leak where the application code does not properly release some of the dynamically allocated memory when it is no longer needed. Which of the following statements is TRUE?

Options:

A.

The slowdown is a failure while the memory leak is a defect

B.

The slowdown is a defect while the memory leak is an error.

C.

The slowdown is an error; the memory leak is a defect.

D.

The slowdown is a defect; the memory leak is a failure.

Questions # 56:

A possible risk of introducing test automation is:

Options:

A.

the tool may not be fit-for-purpose.

B.

the tool may create additional development dependencies.

C.

the tool may not be compatible with the development platform.

D.

the tool will be owned and maintained by developers and replace testers.

Questions # 57:

Which of the following statements about Experience Based Techniques (EBT) is correct?

Options:

A.

EBT use tests derived from the test engineers' previous experience with similar technologies.

B.

EBT is based on the ability of the test engineer to implement various testing techniques.

C.

EBT is done as a second stage of testing, after non-experienced-based testing took place.

D.

EBT require broad and deep knowledge in testing but not necessarily in the application or technological domain.

Questions # 58:

A software development company invests heavily in tools to support the entire software development lifecycle, including testing. They have a tool that allows automated creation and installation of builds and subsequent execution of various types of automated tests. Which ONE of the following is a CORRECT statement about this type of test tool?

Options:

A.

It is an example of collaboration tool

B.

It is an example of test implementation tool

C.

It is an example of DevOps related tools

D.

It is an example of automated unit testing tool

Questions # 59:

Which ONE of the following elements is TYPICALLY part of a test plan?

Options:

A.

The budget and schedule for the test project.

B.

A detailed analysis of the defects found and their causes.

C.

A detailed report on the test results after the test project is completed.

D.

A list of test logs from the test execution.

Questions # 60:

An Incident Management tool implements the following defect states; Open, Assigned, Solved,

Closed Consider the following defect report:

Id T000561

Test Object "Warehouse Management' application

Tester name; John Bishop

Date: 10th. April 2010

Test Case MRT558I

Status OPEN

Severity Serious

Priority

Problem- After inputting the Total Quantity item = 450 in the SV034 screen, the system shows an unexpected Error message=47

Correction:

Developer name:

Closing date:

Which of the following is a valid criticism of this report?

Options:

A.

The Priority, the Correction description and the Developer name are missing

B.

The version of the application is missing

C.

There is no link to the applicable requirement (traceability)

D.

The description is not highlighting the source of the problem

Viewing page 6 out of 13 pages
Viewing questions 51-60 out of questions