Questions # 11:

Which of the following methods can be used as part of product design to prevent component parts from being assembled incorrectly?

Options:

A.

Design for Six Sigma (DFSS)

B.

Design of experiments (DOE)

C.

Tolerance design

D.

Poka-yoke

Questions # 12:

A test for independence of the variables shown in the table below (alternative vs. result) produced a test statistic with a value of χ² = 17.0.

Question # 12

At a significance level of α = 0.05, which of the following conclusions can be made?

Options:

A.

χ²crit = 11.07; do not reject H₀, conclude the variables are independent

B.

χ²crit = 11.07; reject H₀, conclude the variables are dependent

C.

χ²crit = 9.49; do not reject H₀, conclude the variables are independent

D.

χ²crit = 9.49; reject H₀, conclude the variables are dependent

Questions # 13:

In a project status meeting, a senior engineer suggests a change to a customer service process. Even though several team members know the change will alienate one of their major clients, members rush to identify potential benefits of this new change. This response is known as which of the following?

Options:

A.

Consensus

B.

Empowerment

C.

Customer-focus

D.

Groupthink

Questions # 14:

In a normal distribution, the sum of the deviations of data about the mean approaches

Options:

A.

the geometric mean

B.

the variance

C.

the standard deviation

D.

zero

Questions # 15:

Which of the following tools focuses on maximizing equipment effectiveness throughout the life of the equipment?

Options:

A.

6S

B.

OEE

C.

TPM

D.

Jidoka

Questions # 16:

A customer focus group is the most effective way for a company to

Options:

A.

measure customer satisfaction rates

B.

convert customer requirements to product specifications

C.

gain a deeper understanding of customer needs

D.

review customers’ complaints

Questions # 17:

A short-run SPC is used when

Options:

A.

there are small shifts in the mean

B.

a process has demonstrated statistical control

C.

data is collected infrequently or on an aperiodic basis

D.

conventional SPC techniques would be too time-consuming

Questions # 18:

The distribution of sample means will approach a normal distribution whenever the

Options:

A.

population distribution is expected to be normal

B.

population mean is centered between the specification limits

C.

sample size is sufficiently large

D.

sample mean is centered between the control limits

Questions # 19:

Which of the following actions should be taken during the control phase of a project?

Options:

A.

Transferring responsibility to the process owner

B.

Assessing the impact on customer requirements

C.

Providing follow-up of quality function deployment by management

D.

Requiring regularly scheduled stakeholder analysis

Questions # 20:

Using the data provided in the chart, what is the total annual cost?

Options:

A.

5,200

B.

6,200

C.

7,200

D.

8,200