Spring Sale Limited Time 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = simple75
Pass the Pure Storage FAIS FlashArray-Implementation-Specialist Questions and answers with Dumpstech
During the puresetup portion of the new controller setup of an NDU, the Implementation Engineer gets the error message shown in the exhibit. What action should the Implementation Engineer take next?
When updating Purity on a new array, which command should the Implementation Engineer run to start the process?
Before proceeding with a controller upgrade, phonehome logs must be sent. What command will verify that the logs have been sent?
An Implementation Engineer is planning to add a DirectFlash Shelf to a FlashArray//XL with an existing DirectFlash Shelf. Which PCIe slot must be used for shelf connectivity?
Refer to the following output:
Ping successful with CCM
What does this indicate?
In a situation where iSCSI cards need to be re-used during a controller upgrade, which is a valid transfer path?
A FlashArray arrives with Purity 5.3.8 applied out of the factory. The account team requests that the array be configured with Purity 6.1.21. Which steps should the Implementation Engineer select to meet this requirement?
A FlashArray//XR2/3 has an Ethernet mezzanine (EMEZZ), what are the interface names of the ports on the mezzanine?
A client needs to upgrade Purity on their FlashArray, but is unable to wait for an available upgrade date from support. What action should the customer take?
A customer wants to expand the capacity of their FlashArray//X10 from 5/5 to 11/11. Which is the correct action to take?