Spring Sale Limited Time 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = simple75
Pass the Pure Storage FAIS FlashArray-Implementation-Specialist Questions and answers with Dumpstech
When executing a FlashArray upgrade from the FA-405 to a FA-X Series, into which slot on CT1 must the 2 Port InfiniBand Card be installed?
An Implementation Engineer is assigned to install a 4X Module 9.1 TB Conversion Kit in a Flash Array Chassis. Why are there only four Direct Flash Modules?
On a FlashArray//XR20R2/3 Fibre Channel (FC) array, what is the default type and placement of the PCIe FC card?
Prior to running the puresetup newarray command, which command should an Installation Engineer run on a new install of an //XR4 array?
An Implementation Engineer needs to run the puresetup replace procedure on the FlashArray//X during a controller upgrade. Which command should the Implementation Engineer run on the new controller to determine its model?
An Implementation Engineer is onsite to install a new DFM data pack (DP) to CH0.BAY10-CH0.BAY19 of a FlashArray. After adding the drives to the chassis, which command should the Implementation Engineer run to verify if the new DP is in a wide write group?
During a hardware NDU from a FlashArray//X20R3 to an X20R4-LL (low-line) model, the Implementation Engineer encounters a failure during the power supply check. Voltage readings are correct. What is a likely cause of this failure?
What is the longest supported cable length for use with DirectFlash shelves?
An Implementation Engineer arrives on site to complete a shelf evac. What action must take place before Pure Support can run the completion commands?
An Implementation Engineer needs to run the puresetup replace procedure on a FlashArray//XR5 during a controller upgrade. What command should the engineer run to identify the array model?