Refer to the exhibit. The data centers are connected using the E-VPN Multi Site solution. However VLAN 10 tails to extend to the secondary site with the message shown. Which action extends VLAN 10 to the secondary site?
Drag and drop the actions from the left onto the faults that they resolve on the right. Not all options are used.

A vPC Type-1 inconsistency between two vPC peers in a VXLAN EVPN setup is discovered. Which two actions need to be attempted to resolve the issue? (Choose two.)
An engineer configures FCoE between a set of ESXi hosts and a Cisco Nexus 5000 Series Switch. The Converged Network Adapter of the host fails to receive the response from the Cisco Nexus device. Also, the VFC interface is in a down state and the FIP adapter fails to receive 802.1q tagged frames. The host interface is configured for VLAN trunking. Which action resolves the issue?

Refer to the exhibit The Cisco UCS data center network is deployed as follows:
•The port to the CIFS is configured as an appliance
•VLAN 2025 is new and has been deployed on the VLAN appliances.
•The campus LAN can reach the resources on VLAN 2026, but fails to reach the CIFS storage on the newly added VLAN
•The appliance port remains in a " down " state, but the uplink port is in the " up " state to the campus LAN
Which action resolves the issue?
An engineer removes a VMM domain from an endpoint group called EPG-1, but the distributed port group fails to be deleted. Which action must be taken to resolve the issue?