Questions # 1:

Your customer plans to add four HPE Synergy frames to an existing management ring Ail installed frames are equipped with two 2-port FLM modules, while new frames will be equipped with 4-port FLM modules.

Which statement about mixing different FLM modules is true?

Options:

A.

Existing 2-port FLM modules must be replaced with 4-port FLM modules

B.

A management ring can contain mixed frame link module configurations

C.

A management ring with mixed FLM modules cannot have more than 12 frames

D.

Mixing different FLM modules is allowed if all of them have the same firmware version

Questions # 2:

What is one benefit of NVIDIA AI Enterprise on HPE Private Cloud AI?

Options:

A.

Idle GPU-enabled workloads are cleaned up by NVIDIA AI Enterprise schedulers.

B.

All the necessary GPU operators and drivers are deployed for containerized AI applications to use GPUs.

C.

Users receive access to GPU models that are not publicly available.

D.

NVIDIA AI Enterprise sets up secure communications between all GPU-optimized workloads.

Questions # 3:

You are troubleshooting an HPE OneView server profile that presents a critical state. The server profile was configured with a Link Aggregation Group

What should you check to fix the issue?

Options:

A.

if both FiexNICs are configured with the same speed

B.

If the logical enclosure is built on at least three HPE Synergy frames

C.

if both FiexNICs are connected to different networks

D.

if the logical enclosure is configured with redundant master modules

Questions # 4:

After deploying an HPE Superdome Flex 280, you need to check the network protocol status and SSL certificate.

Click the appropriate section In the HPE Superdome Flex 280 management interface that will allow you to complete this task.

Question # 4

Options:

Questions # 5:

Your customer used to manage their HPE 3PAR arrays using HPE OneView. Now they have replaced these arrays with HPE Primera. How does managing the new arrays compare to managing their old arrays?

Options:

A.

Management procedures and features are the same for both types of the array.

B.

HPE OneView offers additional functionalities for HPE Primera like CPG management.

C.

HPE OneView offers limited support for HPE Primera because of the firmware differences.

D.

To manage HPE Primera using HPE OneView, a dedicated license is required.

Questions # 6:

Match HPE SimpliVity team with the definition.

Question # 6

Options:

Questions # 7:

Match HPE Superdome Flex system with its specific feature.

Question # 7

Options:

Questions # 8:

Click the option that will allow you to create an OS Deployment Plan with customized kickstart.

Question # 8

Options:

Questions # 9:

Your customer has the following HPE Synergy setup

- 3 HPE Synergy 12000 Frames

- 4 HPE Virtual Connect SE 100 Gb F32 Modules

- 2 HPE Synergy 50 GO Interconnect Link Modules

- 36 HPE Synergy 480 Gen10 Plus compute modules

- 2 HPE Composer 2 modules

Which statement about this setup is true?

Options:

A.

To use all compute nodes, the customer must create at least two logical enclosures

B.

To manage all frames, the customer must buy two additional HPE Composer 2 modules

C.

The customer must buy 36 HPE OneView Advanced licenses to manage compute modules

D.

The customer can add one D3940 storage Module to each of the frames

Questions # 10:

Your customer wants to add a second HPE Synergy frame to an existing logical enclosure Based on a single HPE Synergy frame. The customer wants to use a highly available master setup.

Which procedures should De performed during the expansion process? (Select two.)

Options:

A.

Create a new logical interconnect group and enclosure group for two frames setup

B.

Create a new logical enclosure based on both HPE Synergy frames.

C.

Re-parent an existing enclosure group to the new logical interconnect group.

D.

Modify an existing logical interconnect to include second HPE Synergy frame.

E.

Move one of the master modules to the appropriate interconnect bay in the second frame.