75only - Ends in 0d 00h 00m 00s - Coupon code = 75only

Pass the HPE ATP - Edge-to-Cloud Architect HPE0-V18 Questions and answers with Dumpstech

Exam HPE0-V18 Premium Access

View all detail and faqs for the HPE0-V18 exam

Practice at least 50% of the questions to maximize your chances of passing.
Viewing page 2 out of 4 pages
Viewing questions 11-20 out of questions
Questions # 11:

A customer with a small central operations team and a number of unstaffed edge sites is adopting a consistent Edge-to-Cloud management approach, expecting it to let the team run every site from one place. What must the proposal still provide for?

Options:

A.

A separate monitoring tool at each site, so that local problems are still seen.

B.

A dedicated administrator for each site, so that every location keeps its own expertise.

C.

A separate set of policies for each site, since unstaffed sites cannot follow central ones.

D.

Someone who can attend an unstaffed site, or remote hands, when hardware needs physical work.

Questions # 12:

An expansion would add a demanding new workload to a customer's existing solution, which currently runs with modest headroom and supports a business-critical process. What must the proposal address that a new-build proposal would not?

Options:

A.

The total cost of the additional capacity over the life of the solution.

B.

Whether the new workload is a good technical fit for the offering being extended.

C.

The effect on what is already running.

D.

Training for the customer’s own team.

Questions # 13:

A customer has agreed to a substantial expansion that will take three quarters to complete. How should the work be sequenced?

Options:

A.

So that the part relieving the current constraint lands first.

B.

So that the whole expansion is commissioned together at the end.

C.

In the order that is most efficient for the delivery team to carry out.

D.

So that the least disruptive elements are completed before the more disruptive ones.

Questions # 14:

A customer moving to a private cloud asks what its own IT function will still be responsible for once teams can serve themselves. What should the architect tell them?

Options:

A.

Only the hardware itself, on the basis that the software side now looks after itself.

B.

The environment itself — its capacity, its policies and its continued operation.

C.

Nothing further, once the environment has been commissioned and handed over.

D.

Approving the requests that teams submit through the self-service mechanism.

Questions # 15:

A customer states that a particular dataset may not leave the country under any circumstances. How should this affect the way options are presented?

Options:

A.

Only options that can demonstrate the data stays within the country should be presented at all.

B.

The customer should be asked to confirm the constraint before any options are prepared at all.

C.

Options should be ranked by cost, with residency one factor among them.

D.

All options should be presented, with the residency implications noted against each one for comparison.

Questions # 16:

A customer with workloads spread across edge sites, its data centre and a public cloud says it cannot tell where its capacity is being consumed, and wants to reduce waste. What should be addressed first?

Options:

A.

Establishing a single view of what is consumed across all three locations.

B.

Renegotiating the commercial terms at each of the three locations.

C.

Consolidating the workloads into whichever location currently has the lowest unit cost.

D.

Reducing the capacity at each location by an agreed percentage.

Questions # 17:

A start-up expects its user numbers to grow substantially over two years but cannot say how quickly. It has limited capital, a small engineering team that would rather build product than run infrastructure, and no regulatory constraint on where its data sits. Which characteristics should the positioned offering demonstrate? (Choose two.)

Options:

A.

The environment is dedicated to the start-up, so no other tenant can affect it.

B.

Capacity is reserved ahead of the user numbers the start-up expects, so nothing is ever held up.

C.

Day-to-day upkeep demands very few staff hours.

D.

The engineering team can move the product elsewhere within two years without penalty.

E.

Supply expands as the load actually rises.

Questions # 18:

A customer will run a workload on infrastructure supplied by HPE, over networking that is being refreshed as part of the same programme, using an application supported by a third party the customer contracts with directly. Which points should the proposal settle explicitly? (Choose two.)

Options:

A.

Where responsibility passes between the infrastructure, the networking and the application.

B.

The order in which the three elements will be commissioned.

C.

Which party supplies the largest share, measured by value.

D.

Whether the third-party application could be replaced by an HPE equivalent.

E.

How a fault whose origin is unclear will be investigated across the parties.

Questions # 19:

A customer running workloads at edge sites, in its data centre and in public cloud wants to manage them coherently. Which capabilities does that require? (Choose two.)

Options:

A.

A single physical network connecting all locations directly.

B.

Identical hardware at every location, so that management behaves the same way everywhere.

C.

Policies that can be defined once and applied consistently across the locations.

D.

A view of the whole estate that does not depend on which location a workload sits in.

E.

Local administrators present at each edge site during working hours.

Questions # 20:

A solution has been designed for a customer whose sites are staffed only during office hours, whose nearest engineer is four hours away from the remotest site, and whose brief asked for continuous availability of a particular service. Which review findings follow? (Choose two.)

Options:

A.

The site that is furthest away should be left out of the round-the-clock rule.

B.

The design must not depend on someone attending a site to restore the service.

C.

The customer should extend site staffing to cover the hours the service must run.

D.

Any component whose failure stops the service needs an automatic means of recovery.

E.

Spare components should be stored at each site to reduce travel time.

Viewing page 2 out of 4 pages
Viewing questions 11-20 out of questions