Spring Sale Limited Time 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = simple75

Pass the ISTQB Foundation Level ISTQB-CTFL Questions and answers with Dumpstech

Exam ISTQB-CTFL Premium Access

View all detail and faqs for the ISTQB-CTFL exam

Practice at least 50% of the questions to maximize your chances of passing.
Viewing page 11 out of 13 pages
Viewing questions 101-110 out of questions
Questions # 101:

Consider the following statements (I to V) about software testing:

I. Can be applied to non-executable work products.

II. Can be used to measure performance efficiency.

III. Can lead to the detection of defects.

IV. Can find defects directly.

V. Can identify unexpected behaviors caused by potential defects.

Which ONE of the following options is the list that characterizes static tests the BEST?

Options:

A.

Statements I, III, and IV

B.

Statements II, IV, and V

C.

Statements I, II, and IV

D.

Statements II, III, and V

Questions # 102:

Which of the following statements correctly describe the business facing quadrant that supports the team?

Options:

A.

Exploratory tests are generally used for this quadrant

B.

It is the quadrant that deals with tests created on the basis of user stories.

C.

It is the quadrant that component testing

D.

It is the quadrant that Non-functional testing such as performance and the tests are created on the basis of user scenarios

Questions # 103:

Which two of the following statements describe the advantages provided by good traceability between the test basis and test work products?

I. Analyzing the impact of changes.

ii. A measure of code quality.

iii. Accurate test estimation.

iv. Making testing auditable.

Select the correct answer:

Options:

A.

i and ii

B.

i and iv

C.

i and iii

D.

ii and iii

Questions # 104:

Mark the correct sentences:

* Defects are a result of environmental conditions and are also referred to as "Failures"

* A human mistake may produce a defect

* A system mil totally fail to operate correctly when a failure exists in it

* When a defect exists in a system it may result in a failure

* Defects occur only as a result of technology changes

Options:

A.

II, IV

B.

I, II

C.

IV, V

D.

II, III, IV

Questions # 105:

Consider the following testing levels:

1) Component Testing

2) Integration Testing

3) System Testing

4) Acceptance Testing

Which of the following statements is true?

Options:

A.

Integration and system testing are applicable when V-model is used.

Component and acceptance testing are applicable when iterative development models are used.

B.

All the testing levels are applicable to V-model for software development.

Only acceptance testing is applicable for iterative models.

C.

Acceptance testing is applicable for all software development models.

Component and system testing are applicable only for the V-model.

D.

All testing levels are applicable, independent of which software development life-cycle process (V-model. iterative, incremental) is used.

Questions # 106:

Can "cost" be regarded as Exit criteria?

Options:

A.

Yes. Spending too much money on test ng will result in an unprofitable product, and having cost as an exit criterion helps avoid this

B.

No. The financial value of product quality cannot be estimated, so it is incorrect to use cost as an exit criterion

C.

Yes. Going by cost as an exit criterion constrains the testing project which will hello achieve the desired quality level defined for the project

D.

No The cost of testing cannot be measured effectively, so it is incorrect to use cost as an exit criterion

Questions # 107:

Which of the following coverage criteria results in the highest coverage for state transition based test cases?

Options:

A.

Can't be determined

B.

Covering all transitions at least once

C.

Covering only start and end states

D.

Covering all states at least once

Questions # 108:

Which of the following is a test-first approach, where tests that express a shared understanding from stakeholders of how the application is expected to work, are first written in business-readable language (following the Given/When/Then format), and then made executable to drive development?

Options:

A.

Test-Driven Development (TDD)

B.

Acceptance Test-Driven Development (ATDD)

C.

Behavior-Driven Development (BDD)

D.

Domain-Driven Design (DDD)

Questions # 109:

Consider the following simplified version of a state transition diagram that specifies the behavior of a video poker game:

Question # 109

What Is the minimum number of test cases needed to cover every unique sequence of up to 3 states/2 transitions starting In the "Start" state and ending In the "End" state?

Options:

A.

1

B.

2

C.

3

D.

4

Questions # 110:

Which ONE of the following statements about state transition testing is correct?

Options:

A.

The state transition diagram explicitly shows all invalid transitions.

B.

The size of the state table depends on the number of possible transitions between the states

C.

Usually it is not possible to create tests to cover ell transitions and all stales

D.

All transitions between states are explicitly shown in the state table.

Viewing page 11 out of 13 pages
Viewing questions 101-110 out of questions