Spring Sale Limited Time 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = simple75

Pass the ISTQB Foundation Level ISTQB-CTFL Questions and answers with Dumpstech

Exam ISTQB-CTFL Premium Access

View all detail and faqs for the ISTQB-CTFL exam

Practice at least 50% of the questions to maximize your chances of passing.
Viewing page 12 out of 13 pages
Viewing questions 111-120 out of questions
Questions # 111:

A state transition diagram describes a control system’s behavior in different operational modes. The initial state is “NORMAL MODE”.

Which ONE of the following test cases covers an INVALID sequence?

Options:

A.

NORMAL MODE → DIAGNOSTIC MODE → DEGRADED MODE → EMERGENCY MODE → DIAGNOSTIC MODE → NORMAL MODE → DIAGNOSTIC MODE

B.

NORMAL MODE → DEGRADED MODE → NORMAL MODE → DIAGNOSTIC MODE → DEGRADED MODE → EMERGENCY MODE → DIAGNOSTIC MODE

C.

NORMAL MODE → DIAGNOSTIC MODE → DEGRADED MODE → EMERGENCY MODE → DIAGNOSTIC MODE → NORMAL MODE → DEGRADED MODE

D.

NORMAL MODE → DIAGNOSTIC MODE → NORMAL MODE → DIAGNOSTIC MODE → EMERGENCY MODE → DIAGNOSTIC MODE → NORMAL MODE

Questions # 112:

Which of the following is an advantage of the whole team approach?

Options:

A.

It helps avoid the risk of tasks associated with a user story not moving through the Agile task board at an acceptable rate during an iteration.

B.

It helps team members understand the current status of an iteration by visualising the amount of work left to do compared to the time allotted for the iteration

C.

It helps the whole team be more effective in test case design by requiring all team members to master all types of test techniques.

D.

It helps team members develop better relationships with each other and make their collaboration more effective for the benefit of the project.

Questions # 113:

Which of the following statements about the shift-left approach is FALSE?

Options:

A.

The shift-left approach can only be implemented with test automation

B.

The shift-left approach in testing is compatible with DevOps practices.

C.

The shift-left approach can involve security vulnerabilities

D.

The shift-left approach can be supported by static analysis tools.

Questions # 114:

A typical objective of testing is to

Options:

A.

Determine the most appropriate level of detail with which to design test cases.

B.

Verify the compliance of the test object with regulatory requirements.

C.

Plan test activities in accordance with the existing test policy and test strategy

D.

Verify the correct creation and configuration of the test environment

Questions # 115:

Given the following state model of sales order software:

    PLACED -> IN PRODUCTION

    IN PRODUCTION -> CANCELLED

    IN PRODUCTION -> SHIPPED

    SHIPPED -> INVOICED

    INVOICED -> CANCELLED

    CANCELLED -> PLACED

Which of the following sequences of tran-sitions provides the highest level of tran-sition coverage for the model (assuming you can start in any state)?

Options:

A.

IN PRODUCTION -> CANCELLED -> PLACED -> IN PRODUCTION -> CANCELLED -> PLACED

B.

IN PRODUCTION -> SHIPPED -> INVOICED -> CANCELLED -> PLACED -> IN PRODUCTION

C.

PLACED -> IN PRODUCTION -> SHIPPED -> CANCELLED -> PLACED

D.

PLACED -> CANCELLED -> PLACED -> CANCELLED -> PLACED -> IN PRODUCTION -> CANCELLED

Questions # 116:

Confirmation testing is performed after:

Options:

A.

a defect is fixed and after other tests do not find any side-effect introduced in the software as a result of such fix

B.

a failed test, and aims to run that test again to confirm that the same behavior still occurs and thus appears to be reproducible

C.

the execution of an automated regression test suite to confirm the absence of false positives in the test results

D.

a defect is fixed, and if such testing is successful then the regression tests that are relevant for such fix can be executed

Questions # 117:

Which of the following is LEAST likely to describe a task performed by someone in a testing role?

Options:

A.

Create test completion report

B.

Evaluate test basis and test object

C.

Assess testability of test object

D.

Define test environment requirements

Questions # 118:

Which of the following sentences describe a product risk?

Options:

A.

The application might not be able to provide the expected responsiveness under a load of up-lo 300 concurrent users

B.

Failure in acquiring an adequate and test automation tool

C.

A wrong configuration of the test environment that causes incidents related to the environment and not to the software under test

D.

The development team lacks knowledge of the technology on which the product is based

Questions # 119:

A company runs a pilot project for evaluation of a test automation tool. Which of the following is NOT a valid object of this pilot project?

Options:

A.

Get familiar with the functionality and options of the tool

B.

Check haw the tool fits to the existing test processes

C.

Train all testers on using the tool

D.

Decide upon standards for tool implementation

Questions # 120:

Which of the following applications will be the MOST suitable for testing by Use Cases

Options:

A.

Accuracy and usability of a new Navigation system compared with previous system

B.

A billing system used to calculate monthly charge based or large number of subscribers parameters

C.

The ability of an Anti virus package to detect and quarantine a new threat

D.

Suitability and performance of a Multi media (audio video based) system to a new operating system

Viewing page 12 out of 13 pages
Viewing questions 111-120 out of questions