Summer Sale Limited Time 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = simple75

Pass the USGBC Leadership in Energy and Environmental Design (LEED) LEED-AP-BD+C Questions and answers with Dumpstech

Exam LEED-AP-BD+C Premium Access

View all detail and faqs for the LEED-AP-BD+C exam

Practice at least 50% of the questions to maximize your chances of passing.
Viewing page 12 out of 13 pages
Viewing questions 111-120 out of questions
Questions # 111:

Which of the following design features enhances accessibility for physical diversity in a mixed-use development project?

Options:

A.

Use high-contrast colours for signage and wayfinding

B.

Provide non-text diagrams and symbols for signage

C.

Create meeting spaces that accommodate mobility devices

Questions # 112:

In order to comply with Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, Option 2, Additional Enhanced Air Quality Strategies:

Options:

A.

All entrances to the building must have entryway systems 10 ft. (3 m) long in the direction of travel

B.

All particle filters in the ventilation system must meet Comité Européen de Normalisation (CEN) standard Class F7 or better

C.

CO₂ monitors must be fitted in all densely occupied spaces and configured to provide an alert

D.

All outdoor air supply systems must have an airflow measurement device that measures at least 90% of the airflow

Questions # 113:

For a bicycle network to demonstrate compliance with Location and Transportation Credit, Bicycle Facilities, the bicycle network must connect to

Options:

A.

five bicycle trails

B.

at least eight diverse uses

C.

a restaurant, a grocery shop, a post office and two bus lines

D.

a rapid transit stop that is within 3 mi. (5 km) biking distance of the project boundary

Questions # 114:

Which of the following is a source reduction strategy to eliminate waste produced by a project?

Options:

A.

Custom design

B.

Design-build

C.

Material science

D.

Prefabrication

Questions # 115:

A commercial office building with a footprint of 70,000 ft2 (6 503.2 m2) has an overall site area of 200,000 ft2 (18 580.6 m2). The project design includes 15,000 ft2 (1 393.5 m2) of pedestrian oriented hardscape and 18,000 ft2 (1 672.3 m2) of vegetated open space. Which of the following is necessary to satisfy the requirement for the outdoor space to be physically accessible when calculating the Sustainable Sites Credit, Open Space?

Options:

A.

A garden space dedicated to industrial food production for use by local communities

B.

A garden space with only one vegetation type and species during the summer for visual interest

C.

A dark paving area with site elements to encourage parking near wetlands or naturally designed ponds

D.

A pedestrian-oriented paving or turf area with physical site elements that accommodate outdoor social activities

Questions # 116:

The LEED project has a main entrance and two service entrances in an alley behind the building. Which entrances need non-smoking signage and at what maximum distance from the door(s) can the non-smoking signage be posted?

Options:

A.

At the main entrance, 10 ft. (3 m) from the door

B.

At the main entrance, 25 ft. (7.5 m) from the door

C.

At the main entrance and the two service entrances, 10 ft. (3 m) from the doors

D.

At the main entrance and the two service entrances, 25 ft. (7.5 m) from the doors

Questions # 117:

Which of the following statements are true for Erosion and Sedimentation Control (ESC) plan prerequisite compliance?

Options:

A.

The ESC plan cannot be modified during the design phase of the LEED certification

B.

The ESC plan can be developed or modified during the design phase of LEED certification

C.

A compliant ESC plan may be developed during construction

D.

A compliant ESC plan must be in place when the commissioning authority is appointed

Questions # 118:

When the LEED AP is applying the Integrative Process to a Building Design and Construction project, which of the following must be included in the Basis of Design (BOD)?

Options:

A.

Training requirements

B.

Allowable tolerance for facility operations

C.

Facility, system and assembly performance assumptions

D.

Environmental, energy efficiency and sustainability goals

Questions # 119:

Which of the following categories is included in a human impact assessment for LEED projects to guide planning, design, and operations?

Options:

A.

Historical landmarks

B.

Demographics

C.

Soil composition

Questions # 120:

Which of the following documents contains the design team's interpretation of the Owner's Project Requirements?

Options:

A.

Basis of Design (BOD)

B.

Simple Box Energy Model Analysis

C.

System's manual

D.

Integrated Project Delivery report

Viewing page 12 out of 13 pages
Viewing questions 111-120 out of questions