Questions # 81:

A new theater is being designed to enhance acoustical comfort for its audiences. One of the main challenges the design team faces is minimizing excessive reverberation. The team plans to incorporate various materials and design strategies to control sound reflections.

Which of the following design strategies should effectively enhance acoustical comfort?

Options:

A.

Install hard flooring surfaces throughout the theater

B.

Maximize the use of soundproof glass walls and windows

C.

Utilize ceiling baffles and wall panels made from sound-absorbing materials

Questions # 82:

For minimum acoustic performance, peak-hour is defined as M

Options:

A.

lowest noise level over a specified sample time

B.

highest noise level over various periods of time

C.

an energy-average of the noise level over a specified sample time

D.

an energy-average of noise level divided by total sample time and area of the space

Questions # 83:

An electrical team installs photovoltaic panels over a parking lot. This action contributes to which of the following credits?

Options:

A.

Optimize Energy Performance

B.

Light Pollution Reduction

C.

Low-Emitting Materials

D.

Demand Response

Questions # 84:

A project team reviews office chairs with a Type III environmental product declaration (EPD) for the five different categories of environmental impact reduction. Which of the following must the chairs demonstrate for product optimization?

Options:

A.

A reduction in at least two categories

B.

A reduction below the industry average in at least three categories

C.

A 5% reduction in all categories

D.

A 10% reduction in GHG emissions and a 10% reduction in at least two other categories

Questions # 85:

Which of the following will result in a higher demand for potable water use in irrigation?

Options:

A.

Sparsely planted area

B.

Drip irrigation system

C.

High evapotranspiration rate

D.

Rainwater harvesting system

Questions # 86:

Which strategy should be employed to improve daylighting when designing a new building?

Options:

A.

Increase the building depth

B.

Increase the number of skylights

C.

Increase the height of interior partitions

D.

Decrease the number of exterior light shelves

Questions # 87:

One point can be achieved through Sustainable Sites Credit, Heat Island Reduction by providing:

Options:

A.

Preferred parking for green vehicles

B.

A minimum of 75% of parking spaces under cover

C.

Access to public transportation stops

D.

A roof with artificial turf grass

Questions # 88:

Plug-in task lighting will be utilized in a LEED project at all workstations. The task lighting is not included in the installed lighting power calculations for Energy and Atmosphere Prerequisite, Minimum Energy Performance since

Options:

A.

it is being covered by Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control

B.

it is specifically exempted by ASHRAE

C.

it will be installed by the owner

D.

the lamp wattage has not been determined

Questions # 89:

Which of the following products must always be included in Materials and Resources credits?

Options:

A.

Faucets

B.

Furniture

C.

Interior Paint

D.

Fire suppression system

Questions # 90:

What document allows a LEED AP to register a project and sign the Certification Agreement?

Options:

A.

Owner Confirmation of Agent Authority

B.

Architect Code of Professional Conduct

C.

Commissioning (Cx) Agent Construction Permit

D.

LEED AP Standard Form of Agreement Between Owner and Architect