Questions # 71:

When should a preliminary water budget analysis be conducted?

Options:

A.

At the time the design development is completed

B.

At the time the plumbing contractor is selected

C.

After completion of schematic design

D.

Before completion of schematic design

Questions # 72:

A project team is providing additional ventilation under Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies. What credit could this adversely affect?

Options:

A.

Energy and Enhanced Commissioning

B.

Indoor Environmental Quality, Thermal Comfort

C.

Energy and Atmosphere, Optimize Energy Performance

D.

Indoor Environmental Quality, Interior Lighting

Questions # 73:

What is the average flush rate for a dual flush toilet with a high flush rate of 1.6 gpf (6 lpf) and a low flush rate of 1.05 gpf (4 lpf)?

Options:

A.

1.05 gpf (4 lpf)

B.

1.19 gpf (4.5 lpf)

C.

1.23 gpf (4.66 lpf)

D.

1.32 gpf (5 lpf)

Questions # 74:

Green Infrastructure (GI) and Low-Impact Development (LID) rainwater management strategies improve upon the conventional approach for rainwater management by

Options:

A.

replicating a site's natural hydrology

B.

discharging rainwater at a faster rate

C.

increasing a site's impervious surface

D.

providing a greater volume of rainwater detention

Questions # 75:

What aspects of each space should the LEED consultant consider to identify the regularly occupied spaces on a project to ensure that floor area values are utilized consistently across credits?

Options:

A.

Rate of outdoor air provided per person

B.

Fire ratings of installed wall and ceiling assemblies

C.

Average number of occupants standing or seated

D.

Typical duration of occupancy in each space per day

Questions # 76:

A community center will be built on a plot in two phases. Phase 1 will include the building with a pool and gymnasium, while Phase 2 will include the outdoor grass soccer fields. For Phase 1 to achieve certification, where can the project set the LEED boundary?

Options:

A.

Around Phase 1 and 2

B.

Around Phase 1 and 2 while committing to keep the Phase 2 grounds undisturbed

C.

Around Phase 1

D.

Around Phase 1 while committing to keep the Phase 2 grounds undisturbed

Questions # 77:

A commercial building aims to reduce potable-water use by utilizing alternative water sources for appropriate applications. The architect must plan water distribution efficiently while considering the quality and treatment requirements of each water source.

Which of the following strategies will efficiently reduce the building’s potable-water consumption while maintaining safe and appropriate water use?

Options:

A.

Use potable water for all purposes and retain alternative water sources only as backup supplies

B.

Use graywater for HVAC cooling-tower makeup water and harvested rainwater for drinking fountains

C.

Use graywater for potable applications after comprehensive treatment

Questions # 78:

Massing and orientation in Integrative Process Credit. Integrative Process evaluates how rotating the building 90 degrees affects

Options:

A.

energy loads

B.

lighting levels

C.

ventilation methods

D.

thermal comfort ranges

Questions # 79:

A request to change the lighting fixtures in a conference room is made by a tenant. Which of the following credit scorecard changes will be directly and indirectly impacted by the change in lighting fixtures?

Options:

A.

Indoor Environmental Quality Credit, Interior Lighting and Sustainable Sites Credit, Light Pollution Reduction

B.

Energy and Atmosphere Credit, Optimize Energy Performance and Indoor Environmental Quality Credit, Interior Lighting

C.

Energy and Atmosphere Credit, Advanced Energy Metering and Indoor Environmental Quality Credit, Daylight

D.

Indoor Environmental Quality Credit, Thermal Comfort and Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies

Questions # 80:

Which of the following plumbing fixtures apply to the calculations in Water Efficiency Prerequisite, Indoor Water Use Reduction?

Options:

A.

Toilets, urinals, pre-rinse spray valves

B.

Toilets, private lavatory faucets, dishwashers

C.

Urinals, public lavatory faucets, kitchen sink faucets

D.

Urinals, showerheads, commercial kitchen filling operations faucets