Questions # 121:

Which of the following statements is correct when defining the project boundary?

Options:

A.

The LEED project boundary cannot include non-contiguous land

B.

The LEED project boundary cannot include more than one building

C.

The land associated with the project supports typical operation

D.

The gross floor area of the LEED project should be no less than 1% of the gross land area within the LEED project boundary

Questions # 122:

In the Indoor Environmental Quality Credit, Low-Emitting Materials, what types of products need to be evaluated for

both Volatile Organic Compound (VOC) content of the material and VOC emissions of the material?

Options:

A.

Flooring

B.

Furniture

C.

Composite wood

D.

Wet applied products

Questions # 123:

When preparing the Sustainable Sites Prerequisite, Construction Activity Pollution Prevention, the Construction General Permit must contain which of the following?

Options:

A.

Waste Management Plan

B.

Building orientation on the site

C.

Installation plan for perimeter control

D.

Minimum standards for equipment exhaust

Questions # 124:

The Lakeside Resort is a hotel in a rural area located about 60 mi. (96.6 km) from the nearest town, which has a population of 10,500. There are no other towns for over 200 mi. (321.9 km). The surrounding community is largely made up of ranches and federal- and state-owned land.

The project consists of a single building that includes 150 guest rooms, a small restaurant, an indoor pool, conference spaces, event spaces, and six tenant spaces. A lease has been secured for a future spa, gift shop, coffee shop, and tour operator. Two tenant spaces have not yet been leased. The 10-acre property is adjacent to a lake and provides trail access to public lands.

When drawing the LEED boundary for this project, the project team should include all:

Options:

A.

Of the development footprint (parking lots, building, sidewalks, and paths around the property) plus the land extending 100 ft. from the development footprint

B.

Land associated with the project and adjacent areas that include attractions occupants are expected to use

C.

Contiguous land that is associated with the project and supports its typical operations

Questions # 125:

Which of the following projects are eligible for LEED certification?

Options:

A.

Prefabricated sandwich panel house

B.

New office building900 ft² (83.6 m²)

C.

Houseboat

D.

Mobile home

Questions # 126:

What percentile of runoff from a regional development of an office building must a project manage on site by using low-impact development and green infrastructure to achieve three points under the Sustainable Sites Credit-Rainwater Management, Option 1. Percentile of Rainfall Events?

Options:

A.

98th percentile

B.

85th percentile

C.

95th percentile

D.

100th percentile

Questions # 127:

Which one of the following represents quality transit service as defined in Location and Transportation Credit, Access to Quality Transit?

Options:

A.

A bus stop served by two bus lines Monday through Friday, located 1/8 mi. (0.20 km) from the project building

B.

A rail station served by one train line Monday through Sunday, located 1/2 mi. (0.80 km) from the project building

C.

A rail station served by two train lines Monday through Sunday, located 1 mi. (1.60 km) from the project building

D.

A private shuttle bus stop providing hourly service Monday through Friday to a rail station two hours away, located across the street from the project building

Questions # 128:

Which principal areas must the LEED AP focus on to attain the Integrative Process Credit, Integrative Process?

Options:

A.

Materials and resources

B.

Location and site selection

C.

Regional priority and innovation

D.

Energy and water related systems

Questions # 129:

Which of the following cannot be classified as graywater?

Options:

A.

Water from toilets

B.

Water from showers

C.

Water from kitchen sinks

D.

Water from lavatory faucets

Questions # 130:

A project team is pursuing points under EAc3: Enhanced Energy Efficiency using a whole-building energy simulation method. When modeling a baseline design, which of the following inputs must be the same as proposed design inputs?