Questions # 101:

Which label or certification indicates reduced water consumption for appliances?

Options:

A.

ASHRAE 90.1

B.

GREENGUARD

C.

ISO 14001:2015

D.

ENERGY STAR

Questions # 102:

Which statement is the U.S. Green Building Council vision?

Options:

A.

A transformed built environment leading to a sustainable future

B.

Buildings and communities will regenerate and sustain the health and vitality of all life within a generation

C.

Meeting the goals of the Paris Agreement and improving the lives of millions of citizens through better buildings

D.

To transform the building and construction sector across three strategic areas - climate action, health and wellbeing and resources and circularity

Questions # 103:

All LEED rating systems include:

Options:

A.

110 base points plus five Innovation points and two Regional Priority points for a total of 117 points

B.

100 base points, plus six Innovation points and four Regional Priority points for a total of 110 points

C.

90 base points plus four Innovation points and six Regional Priority points for a total of 100 points

D.

110 base points plus six Innovation points and four Regional Priority points for a total of 120 points

Questions # 104:

The maximum points a new construction platinum LEED for Neighborhood Development certification level can earn are

Options:

A.

8

B.

10

C.

12

D.

16

Questions # 105:

The LEED reviewer advised a project team that an inappropriate rating system was chosen for a newly constructed school in operation for one year and undergoing minor improvements. What should the project team have done differently to avoid this error?

Options:

A.

Allow the LEED Project Administrator sole responsibility to review the appropriate rating system for the project

B.

Select LEED for Schools New Construction and Major Renovations Rating System, as this project is classified as a school

C.

Select LEED for Existing Buildings: Operations and Maintenance Rating System, as the Operational and Maintenance phase has begun

D.

Review the appropriate rating system and determine the best adaptation to use with consultation from U.S. Green Building Council

Questions # 106:

Which LEED adaptation includes the ability to reduce point thresholds for LEED certification levels based on building size?

Options:

A.

LEED Interior Design and Construction: Retail

B.

LEED Neighborhood Development: Built Project

C.

LEED Building Design and Construction: Homes

D.

LEED Building Design and Construction: Schools

Questions # 107:

Which of the following plans is implemented after occupancy?

Options:

A.

Green Cleaning

B.

Value Engineering

C.

Fundamental Commissioning (cx)

D.

Stormwater Pollution Prevention

Questions # 108:

In a new building, which of the following is an effective way to confirm a building’s performance compared with performance goals, design specifications, and the Owner’s Project Requirements?

Options:

A.

Provide staff training

B.

Perform Commissioning (Cx) activities

C.

Purchase Renewable Energy Certificates (RECs)

D.

Establish design and energy goals

Questions # 109:

What do the credits in the Materials and Resources category focus on?

Options:

A.

Reducing the quantity of materials used on a project

B.

Selecting materials that are more energy efficient than traditional building materials

C.

Minimizing the embodied impacts associated With the entire life-cycle of building materials

D.

Helping project teams select materials that have the most environmental benefits at the least cost

Questions # 110:

Minimum acoustic performance is a prerequisite requirement that applies to

Options:

A.

LEED for Schools

B.

LEED for Hospitality

C.

LEED for Healthcare

D.

LEED for New Constructions and Major Renovations