Spring Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = simple70

Pass the Oracle Manufacturing Cloud 1z0-1075-25 Questions and answers with Dumpstech

Exam 1z0-1075-25 Premium Access

View all detail and faqs for the 1z0-1075-25 exam

Practice at least 50% of the questions to maximize your chances of passing.
Viewing page 1 out of 2 pages
Viewing questions 1-10 out of questions
Questions # 1:

Your client informs you that after running the " Process Item Structure Changes to Work Definitions " scheduled process, they received a workflow notification.

Which statement is NOT a workflow notification that you might get if automation is not performed?

Options:

A.

The replacement component has been assigned as an ad hoc Item to the same operation as the original component.

B.

The manufacturing plant Is enabled for ERES, the work definition changes are not expected to go through an approval process.

C.

The original component is not assigned to any work definition operation.

D.

The original component has been assigned to more than one work definition operation.

Questions # 2:

You are implementing project-driven supply chain functionality. You need to set up movement requests to issue or transfer project material to manage the inventory associated with projects and tasks.

Which two are types of movement requests to issue or transfer project material?

Options:

A.

Transfer project material from one subinventory to another.

B.

Pick transactions Interfaced by the project costing project and task using the project material, common Inventory, or Inventory from another project.

C.

Create o movement receipt line with the Project Costing widget.

D.

Perform manual pick for such movement requests using the project material, common inventory, or inventory from another project.

Questions # 3:

An employee is responsible for dealing with different manufacturing practices and processes, machines, tools, and equipment that turn raw material into a product.

Which seeded job role must you assign to this employee?

Options:

A.

Manufacturing Engineer

B.

Production Engineer

C.

Manufacturing Supervisor

D.

Production Operator

E.

Production Supervisor

Questions # 4:

Which statement is NOT true about cumulative lead time?

Options:

A.

It calculates cumulative manufacturing lead times by rolling up manufacturing lead times of make Items.

B.

It updates the item ' s lead time attributes at the end of the calculation process: cumulative manufacturing and cumulative total lead times.

C.

It calculates cumulative total lead times by rolling up lead times of make items and adding up lead time values of buy items.

D.

It updates lead time percent at the operation level in the work definition.

Questions # 5:

In a manufacturing plant, two purchase components, PI and P2, and a resource, Rl, are required to assemble a product. The cost of the assembly is calculated by using the standard costing method. The work definition and resource rates for the assembly have been defined as Required.

A Cost Accountant is estimating cost of the assembly, and analyzing rolled-up costs before finally publishing estimates as frozen standards to Cost Accounting by using a Cost Planning Scenario. While reviewing rolled-up costs, the extended costs of purchase components are not included in a rolled-up scenario.

What is the reason for this?

Options:

A.

Costs for purchase components PI and P2 are not defined In Cost Accounting.

B.

Purchase components PI and P2 are not associated with the material cost plan of the Cost Planning Scenario.

C.

Create Accounting was not initiated.

D.

Create Accounting Distributions was not initiated.

Questions # 6:

Your client is planning to override the Plant Production Calendar with One or More Date-Effective Work Center Calendars. You need to explain the consideration when using the Override the Plant Production Calendar with One or More Date-Effective Work Center Calendars feature.

Which three statements are true when overriding the production calendar?

Options:

A.

The Work Execution Work Area Infolets and Manage Production Exceptions page are based on the plant calendar and not on work center calendars.

B.

While defining override calendars, you need to ensure that the date effective range for a work center calendar association can be overlapping and contiguous.

C.

Even if there are override calendars, the lead time calculation in days for an item remains based on the plant calendar and not on work center calendars.

D.

When the user executes search action in the Review Dispatch List page, if more than one work center are selected and if the start date or completion date is based on Shift-based search, then the operations are queried based on the shifts of the plant calendar only.

E.

Supplier operations used in outside processing use the work center calendar in work order scheduling.

Questions # 7:

Which three statements are true about managing Units of Measure?

Options:

A.

You must define the unit of measure class with a base unit of measure.

B.

If you want to transact items in units of measure that belong to classes other than their primary UOM class, you must define conversions between the base units of measure in different UOM classes.

C.

A unit of measure standard conversion specifies the conversion factor by which the unit of measure is equivalent to the unit of measure class.

D.

Conversions between classes are unique for each item; the conversion rate varies for intraclass units of measure.

E.

A unit of measure conversion is a mathematical relationship between two different units of measure.

Questions # 8:

Which three are Cost accounting methods '

Options:

A.

Perpetual Average Cost

B.

Layer Cost, also known as " LIFO "

C.

Frozen Standard Cost

D.

Actual Cost, also known as " FIFO "

E.

Periodic Actual Cost

Questions # 9:

Which three entities must you set up in Oracle Manufacturing Cloud to create a work definition for an item that will be manufactured in-house?

Options:

A.

Resources

B.

Operations

C.

Production line

D.

Operation items

E.

Manufacturing lead time

Questions # 10:

Which three can you set as Overcompletion Tolerance Type and its value for a subcomponent yield, so that the job order can report the excess production completion?

Options:

A.

Overcompletion Tolerance Type = Percentage; value = 0

B.

Overcompletion Tolerance Type = Percentage; value = 100

C.

Overcompletion Tolerance Type = Amount; value = 0

D.

Overcompletion Tolerance Type = Amount; value > 0

E.

Overcompletion Tolerance Type = Percentage; value > 0

Viewing page 1 out of 2 pages
Viewing questions 1-10 out of questions